Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM00352
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/17/2009 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
02/18/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
02/18/2009 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/20/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
02/24/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
02/24/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Footnote 2 in Table 7-5, UPC 2006 indicates that a sink requires a 2" vertical waste pipe therefore the wet- vented section between the break room sink and the service sink shall be 2-1/2", not 2" in size. Reference: Sections 703.1 and 908.2, UPC 2006. 2. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 3. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 4. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006. |
02/24/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
02/24/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide information to show how the condensate drain system has been sized. Reference: Section 307.2.2, IMC 2006, as amended by the City of Tucson. 2. Provide information on the sequence of operation for the restroom exhaust fans to show that recirculation of the air from the restrooms will not occur (i.e. the exhaust fans shall operate whenever AC-4 is supplying air to the restrooms). Reference: Section 403.2.1, IMC 2006. 3. Revise the ventilation calculations to take into account the different occupancy loads in the project space (i.e. AC-4, which serves the conference room, an office, and a corridor, has inadequate ventilation air). Reference: Sections 403.3 and 403.3.2, IMC 2006. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/27/2009 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
02/27/2009 | SUE REEVES | REJECT SHELF | Completed |