Permit Number: T09CM00299
Parcel: 110035860

Review Status: Completed

Review Details: POST 3RD PARTY REVIEW

Permit Number - T09CM00299
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/12/2009 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
02/12/2009 ROBERT SHERRY WATER REVIEW Approved
02/12/2009 DAVE MANN FIRE REVIEW Denied Please include the following design criteria to the plans.
1. Flow data (static pressure, residual pressure, GPM)
Available from the Fire Department (520) 791-3234
2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D)
3. The hazard classification of the building, including any special hazards.
4. The density required of the water supply.

Please indicate existing fire hydrant location(s), with dimensions to buildings and/or property lines. Refer to City of Tucson amendments to the 2006 International Fire Code (section 508) for spacing and location requirements.
02/12/2009 RONALD BROWN ADA REVIEW Passed NOT A COT PROJECT
02/12/2009 BIANCA RAMIREZ ENGINEERING REVIEW Approved
02/13/2009 GERRY KOZIOL WWM REVIEW Approved
02/19/2009 RONALD BROWN ZONING HC SITE REVIEW Passed THIRD PARTY ACCESSIBLE REVIEW REFERENCE WILDAN COMMENTS
02/20/2009 TERRY STEVENS ZONING REVIEW Denied 02/23/2009

Development Services Department
Zoning Review Section

Terry Stevens
Lead Planner

Comments:

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan as submitted. Per Development plan D07-0017 and sheet A1.2 of the building plans, there is a 20' space between building 1-N and building 1-S. The building 1-N per the building plans is 100' in length. Per the DP the maximum length of the building is 80'. Revise the building plan to comply or a revised development plan will be required to accommodate the increase in the size of the building,.
02/27/2009 JEFF DRUMM LANDFILL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
03/02/2009 GERARDO BONILLA OUT TO CUSTOMER Completed