Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM00207
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/28/2009 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
01/28/2009 | GERRY KOZIOL | WWM | REVIEW | Approved | |
12/10/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
12/10/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
12/10/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Approved | |
12/11/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
12/11/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. This activity is being reviewed to the 2006 UPC. If the 2006 IPC is desired, submit an appeal to the building official. 2. The minimum residual water pressure is 15 PSI, not 8 PSI. Reference: Section 608.1, UPC 2006.3. Provide an upper terminal cleanout for the breakroom sink. Reference: Section 707.4, UPC 2006. 3. Appliances (e.g. ice makers) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Table 6-3, UPC 2006 require backflow prevention. Reference: Sections 602.3, 603.0, and Table 6-2, UPC 2006. 4. Clarify the need for drainage for the ice machine. Reference: Sections 103.2.3 and 801.2, UPC 2006. |
12/11/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/14/2009 | DROBEY1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/14/2009 | DELMA ROBEY | OUT TO CUSTOMER | Completed |