Permit Review Detail
Review Status: Completed
Review Details: REVISION - GRADING
Permit Number - T09BU01778
Review Name: REVISION - GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/24/2010 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: June 24, 2010 SUBJECT: 3607 E Speedway Blvd- Revised Site and Grading Plan TO: Seaver Franks Architects LOCATION: T14S R14E Sec04 Ward 6 REVIEWERS: Jason Green, CFM ACTIVITY: T09CM03157 (Site Plan), T09BU01778 (Grading Plan) and T10OT00094 (Floodplain Use Permit) SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the revised site plan (T09CM03157) and grading plan (T09BU01778) for the above referenced property. Engineering Division does not recommend approval of the site plan or grading plan at this time. SITE PLAN COMMENTS: The following comments or from the 3rd revision review. Revision reviews #1 and 2 (under the same revision folder in Permits Plus) were completed at the counter with the applicant and corrections were redlined on the plan. The following comments still need to be addressed prior to site plan approval: 1) Revise Sheet 1 to correctly show the improvements as proposed on Sheet 2. For example Sheet 2 has revised the 18-foot radii for the north PAAL to a standard driveway apron detail and one of the refuse container locations has been removed, Sheet 1 should reflect these revisions. 2) Provide a new detail on Sheet 3 to correctly show the new 24' sliding gate detail. The 18-foot radii are no longer applicably due to the proposed standard driveway aprons therefore the detail must be revised to reflect what is proposed. 3) Verify that all 3 sheets of the proposed site/grading plan match each other for the proposed improvements (i.e. revised sidewalk location, removal of refuse container, standard driveway aprons, etc.). GRADING PLAN: 4) The grading plan (T09BU01778) application will be stamped approved with the site plan once all comments have been addressed. GENERAL COMMENTS: Please provide a revised site plan and grading plan set that addresses the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments. Enclose "redlines" with the resubmittal package. Further comments may be generated upon resubmittal of the plan review. Jason Green, CFM Senior Engineer Associate Engineering Division COT Planning & Development Services |
| 06/30/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: James Autosports T09BU01778 Grading Plan (Revision) TRANSMITTAL DATE: June 30, 2010 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site plan with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t09bu01778 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved site plans and additional requested documents |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/15/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |