Permit Number: T09BU01741
Parcel: 116300050

Review Status: Completed

Review Details: POOL/SPA

Permit Number - T09BU01741
Review Name: POOL/SPA
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/16/2009 MICHAEL ST. PAUL ZONING REVIEW Denied Final approval required for T09CM03032.

Submit this pool plan with the site plan being reviewed.
12/21/2009 RONALD BROWN BUILDING-RESIDENTIAL REVIEW Approved
12/22/2009 ELIZABETH LEIBOLD ENGINEERING REVIEW Denied DATE: December 22, 2009
TO: Greg Carlson, PE
SUBJECT: 3362 W LOST STARR PL Site, Pool, & Grading Plan Review
LOCATION: Lot 5 Wildcat Pass
REVIEWER: Elizabeth Leibold
ACTIVITY NUMBER: T09CM03032, T09BU01718, T09BU01741

Summary: Engineering Division has reviewed the site and grading plan portion of the submittal package and does not recommend approval at this time. Address the following comments for resubmittal.

SITE PLAN COMMENTS:
The following 7 comments are from the 10DEC09 T09CM03032 comments and shall be addressed for the site plan:
1) DS Sec.3-01.4.4.B: Revise cross section and/or provide the following additional cross sections for clarification to provide and label the Final Plat EHSB line on planviews and in section details. Add note to plans that EHSB was determined by engineer to be at 100-year floodplain limit per drainage report etc.
2) Show Final Plat floodplain limits per plat on planview and label both sets of floodplain delineations.
3) Per General Note 11 on the Final Plat, a floodplain use permit is required for this lot. Submit application for Floodplain Use Permit with next submittal.
4) DS Sec.11-01.4.1.C.3: Delineate disturbance limits to show as including utilities and the limits need to provide for sufficient space for grading construction. It may be necessary to indicate heavy duty construction fence to restrict construction activity along the side yard grading limit boundaries.
5) Indicate grade break location and elevation on plan view for interceptor swale at top of north cut slope near concrete bench.
6) Provide a few additional proposed spot elevations in rear of yard north of kitchen to indicate positive drainage away from foundation and toward drainage focal points. Clarify any stair elevations.
7) DS Sec.11-01.4.1.C: Address the following General Notes comments:
a) Add reference to the City of Tucson Development Standards 11-01 for grading standards.
b) Add that the project will comply with City of Tucson Land Use Code Sections 2.8.1 Hillside Development Zone (HDZ).
c) DS Sec.11-01.4.1.C: Add note that rip rap slopes shall have handplaced rip rap with filter fabric per HDZ requirements.

POOL COMMENTS:
8) None.

GRADING PLAN COMMENTS:
9) Address the following grading comments on grading planview sheet 2:
a) Show swale continuation from north of garage area to the driveway pipes, labeling spot elevations for swale invert to show positive gradient along swale and to minimize potential for runoff to be directed toward structure.
b) Add note to grading plan that geotechnical engineering field reports and final geotechnical engineering conformance letter are required prior to final grading approval.
c) Add note or show on planview the 3 percent for 5 feet minimum grade per geotechnical report for slopes around perimeter of structure.
d) For the area at the rear of yard north of kitchen, patio drain will be assumed to be clogged since there are no secondary pipe systems. Explain and show how ponding will not occur in this area.
e) Address comments 4-7 above for grading plan as well.
10) Assure all Final Plat data within lot boundary with affected easements, is shown on plans, including distance for L280 per plat.
11) For resubmittal, provide 2 copies of the revised Site & Grading Plan sheets and any other supporting documents, with a response letter.

I can be reached at 837-4934 if you have questions or would like to set up a meeting to go over resubmittal.

Elizabeth Leibold, PE
Civil Engineer
Engineering Division
Planning & Development Services Department