Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T09BU01125
Review Name: GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/10/2009 | MICHAEL ST. PAUL | ZONING | REVIEW | Passed | |
08/11/2009 | ANDREW CONNOR | NPPO | REVIEW | Passed | |
08/28/2009 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | SUBJECT: TAA Landfill Cap north of Aeropark Bl submittal Grading Permit Engineering Review LOCATION: T15S R14E Section 19 REVIEWER: Elizabeth Leibold ACTIVITY NUMBER: T09BU01125 / T09OT01608 SUMMARY: The Landfill Cap plans and documentation were submitted to the City of Tucson for review. It is understood that this solid waste landfill per state and federal regulations and will consist of grading the top of the landfill to provide a smooth surface with a 2-foot thick cap of soil, covering with drought resistant vegetation to minimize erosion, and providing post construction monitoring systems. Planning & Development Services Department PDSD Engineering has reviewed the received items and recommends approval of the floodplain use permit application and grading plan. The following conditions apply to the grading permit: CONDITIONS OF GRADING PERMIT: 1) There shall be no disturbance outside of these approved grading limits. 2) Stormwater shall be prevented from entering and possibly causing ponding/infiltration within the landfill boundary. 3) Any grading outside of the grading limits requires separate grading permit or a submittal, review, and approval for separate permits. 4) Submit copies of Geotechnical / Soils Reports or other closure completion documentation to PDSD for final reports. 5) A SWPPP submittal/review/approval is required prior to commencement of construction. 6) A copy of this plan with grading permit, SWPPP, and supplemental reports shall be kept at the site at all times, until final grading approval. 7) Call to invite Jim Femling/Elizabeth Leibold to EPA pre-construction meeting. Also, call to see if a SWPPP inspection and Grading Pre-construction meeting will be required. For a DSD Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 837-4888. It will be necessary to pay any outstanding grading fees prior to picking up permit. If you have questions, call me at 837-4934. Elizabeth Leibold, PE Civil Engineer Engineering Division Planning & Development Services Department |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/17/2011 | SUE REEVES | APPROVAL SHELF | Completed |
02/17/2011 | CPIERCE1 | OUT TO CUSTOMER | Completed |