Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SWPPP
Permit Number - T09BU01026
Review Name: SWPPP
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/30/2009 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 07/30/2009 SWPPP Comments: 1. All text shall be 12 point on the SWPPP Exhibit. 2. Identify the receiving waters on the SWPPP Exhibit Location Map as required by Part III.C.4. 3. Show the floodplain delineation on the SWPPP Exhibit. 4. Revise the sequence of site activities Section to include the first two activities are to determine the disturbance limits, and to install the proposed BMP's within these limits. 5. Show on the SWPPP exhibit possible locations of on-site waste storage or receptacles and borrow areas (Part III.C.3.e). Include the storage and waste area symbols in the legend. 6. Identify any city or county which received a copy of the authorization certificate (Part III.D.4). 7. Describe how BMPs will be added, modified, or replaced for each phase or sequence of construction activities. Also, identify which operator is responsible for the implementation of BMPs (Part III.C.5.b). 8. Additional information may be required with next submittal If you have any questions, I can be reached at 837-4933 or Laith.Alshami@tucsonaz.gov |