Permit Number: T09BU00626
Parcel: 140100110

Address:
3088 E BENSON HY

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T09BU00626
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/15/2009 JASON GREEN ENGINEERING REVIEW Approved DATE: July 17, 2009
SUBJECT: 3088 E Benson Hwy Grading Plan- 2nd Engineering Review
TO: Stanley Engineering & Drainage, Inc. Attn: Jeff Stanley
LOCATION: T15S R13E Sec14 Ward 04
REVIEWERS: Jason Green, CFM
ACTIVITY: T09BU00626 (Grading Plan) and Floodplain Use Permit (T09OT00880)

SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed grading plan (T09BU00626), Floodplain Use Permit (T09OT00880), Hydrologic/Hydraulic Report (Stanley Engineering & Drainage, Inc., 06MAR09, 16APR09, 13JUL09), Geotechnical Report (Foree&Vann, Inc., 21MAY08, addendum 29MAY09) and Stormwater Pollution Prevention Plan (Stanley Engineering & Drainage, Inc., 29APR09) for the above referenced property. Engineering Division recommends approval of the grading plan and Floodplain Use Permit at this time.

HYDROLOGIC/HYDRAULIC (HH) REPORT:

1) Complied.
2) Complied.

GRADING PLAN COMMENTS:

3) Complied.
4) Complied.
5) Provide the recordation information for the temporary construction easement from the adjacent property owner for the proposed temporary fill slope that is shown offsite along the west side of the vehicular use area. All offsite grading and improvements on adjacent properties require a temporary construction easement from the owner and adjacent property owner for any proposed improvements. Grading of the site can not be permitted until the temporary easement is recorded.
6) Complied.
7) Complied.
8) Complied.
9) Complied.
10) Complied.
11) Complied.
12) Complied.
13) Acknowledged.
14) Complied.

GEOTECHNICAL REPORT:

15) Complied.

STORMWATER POLLUTION PREVENTION PLAN COMMENTS:

16) Complied.

GENERAL COMMENTS:

For questions or to schedule an appointment I can be reached at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Development Services
07/16/2009 STEVE SHIELDS ZONING REVIEW Approved
07/17/2009 PETER MCLAUGHLIN NPPO REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
01/05/2010 SUE REEVES APPROVAL SHELF Completed