Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T08PI00028
Parcel: Unknown

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T08PI00028
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/13/2008 SMONTIE1 UTILITY CLEARANCES COT STREETS DIVISION Completed
10/13/2008 SMONTIE1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
10/13/2008 SMONTIE1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
10/13/2008 SMONTIE1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
10/13/2008 SMONTIE1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
10/13/2008 SMONTIE1 UTILITY CLEARANCES COX COMMUNICATION Completed
10/13/2008 SMONTIE1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
10/13/2008 SMONTIE1 UTILITY CLEARANCES EL PASO NATURAL GAS Passed
10/13/2008 SMONTIE1 UTILITY CLEARANCES KINDER MORGAN ENERGY Passed
11/03/2008 GARY WITTWER DOT LANDSCAPE REVIEW Denied Please submit a copy of your approved landscape and irrigation plans. NOTE: you can not place private irrigation lines under public roadways without a recorded easement.
11/04/2008 RICHARD LEIGH DOT ENGINEERING REVIEW Denied November 3, 2008

PROJECT: La Cima Esplendora, PIA: T08PI0028

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Include the plan number "I-2008-030" in title block of each sheet.

2. Include Development Services Department PIA activity number "T08PI00028"on cover sheet.

3. Use standard abbreviations per PC/COT Standard detail 101.

4. Provide stationing, offsets and elevations for all ECRs, BCRs and APs.

5. Label roadway centerline, in the plan view, with stationing at 100 and 50 foot intervals.

6. Label all details for clarification.

7. Verify that all pedestrian crosswalks, at the intersections, have a cross slope no grater than 2%.

8. Provide a detail for the proposed local depression at the inlets of sidewalk scuppers.

9. Roadway pavement widths should remain constant a curb transitions.

10. Sheet 7, Curb access ramp details: Label curb at back of ramp, indicate ramp slopes, provide a ramp lengths a minimum of 6' 6". Additionally the tactile warning device only needs to be 2' wide for the width of the ramp.

11. Sheet 5: Verify stationing in profile view near Sta. 13+00 Placita Dos Pesos. Stationing along knuckle is confusing.

12. How and when will rezoning requirements 4, 8, 9, and 10 be addressed.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
11/12/2008 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this plan and have the following comments:

1. Sheet 1 - Notes - What is the asphalt mix type that will be used for this project?
2. Sheet 4 - Cross Sections - It appears that with the on-street parking that there are only two 8' travel lanes. Has this been approved by Traffic Engineering?
3. Sheet 4 - Cross Sections - One of the roadways has a 4.17% cross slope. Has this been approved by Traffic Engineering?
4. Sheet 4 - Is there any proposed landscaping with this project? If so, please submitt the plan to Paul Rosenboom at 4004 S. Park Avenue Bld #2 for review. Please remember that private irrigation lines can not be under public roadways without an easement.
5. Sheet 6 - Spillway Detail - It appears that two different treatments are called out for the spillway. One is rip rap over a filter fabric and the other is rip rap placed in morter. Please clarify.
6. All work in the public right of way needs to be coordinated with Paul Rosenboom at 791-5279 ext 234 to prevent damage to existing landscaping and irrigation.

No further comments
11/13/2008 JOSE ORTIZ DOT TRAFFIC REVIEW Denied November 13, 2008
ACTIVITY NUMBER: T08PI00028
PROJECT NAME: La Cima Esplendora
PROJECT ADDRESS: 10200 E Escalante Rd
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

3. Install street names at the proposed roadway entering this development off of Escalante Road per PCDOT & TDOT Signing Manual (2002) Chap 5-11, 5-12, and Chap 9-2.

4. Provide a revised detail of the No Parking sign to be used. There is one attached to this comment sheet.

5. Place the PIA and CDRC Case number on the cover sheet.

6. Add the following Signing General Notes 5(a) & 5(b) per PCDOT & TDOT Signing Manual (2002) (Chapter 1, Sheet 12) to the Plans.

7. Add the following Pavement Marking/Striping General Notes to the Plans:

'ALL STREET STRIPING & SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED STRIPING AND SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. NEW STRIPING TO BE THERMOPLASTIC MATERIAL. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.'

'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.'



If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
11/17/2008 SMONTIE1 PIA COORDINATOR CUSTOMER CALLED Completed
11/17/2008 SMONTIE1 PIA COORDINATOR OUT TO CUSTOMER Completed