Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T08PI00022
Review Name: PIA SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/06/2008 | SMONTIE1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | Please submit utility clearance letters. |
| 08/06/2008 | SMONTIE1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | Please submit utility clearance letters. |
| 08/06/2008 | SMONTIE1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | Please submit utility clearance letters. |
| 08/06/2008 | SMONTIE1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | Please submit utility clearance letters. |
| 08/06/2008 | SMONTIE1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | Please submit utility clearance letters. |
| 08/06/2008 | SMONTIE1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | Please submit utility clearance letters. |
| 08/06/2008 | SMONTIE1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | Please submit utility clearance letters. |
| 08/06/2008 | SMONTIE1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | Please submit utility clearance letters. |
| 08/06/2008 | SMONTIE1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | Please submit utility clearance letters. |
| 08/15/2008 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed this plan and have the following comments: 1. Please provide a Streets and Traffic Maintenace signature block. 2. Sheet 2 - Will the be any changes to the existing striping? If so, striping plan will need to be approved by Traffic Engineering. 3. Sheet 2 - Will there be any landscaping installed with these improvements? If so, please submit the landscape plan to Paul Rosenboom at 4004 S. Park Ave. Bld #2 for review. 4. Do you know which asphalt mix will be used for the paving? Electric Shop 5. Sheet 2 - Intercept existing street light conduit and install new conduit and wire to the new pullbox location. Landscaping 6. Sheet 1 - Note 15 - Please add that Sleeves need to be extended or installed at all road crossings and driveways. |
| 08/19/2008 | Blanca Espino | DOT ENGINEERING | REVIEW | Denied | PIA Plan 1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word responses are unacceptable. Include plans/redlines from previous plan submittal. 2. Submit a copy of the approved Tentative Plat. 3. Sheet 1, Cover sheet title shall read, "6th Ave. & I-10 Offsite Improvements for Circle K". This title will match for what's shown in the title block. Indicate the new Map & Plat, Book & Page recording information. Plat must be recorded before submittal of mylars for final review and approval. See redlines. 4. All Easements, dedications, right-of-way should be depicted in plan view and labeled with recordation information (docket/page or plat book/page). 5. Correct the title blocks to match the attached outline. See title block areas. 6. Relocate administrative address and the parcel legal description. See redlines. 7. In title block, add assigned I-Plan Number, I-2008-023 to all sheets. See redlines. 8. Indicate assigned DSD activity number T08PI00022 above title block. See redlines. 9. The Basis of Elevation must reference "City of Tucson Field Book and Page". 10. Remove Paving Notes # 2 & 3. 11. Paving Note #5, Indicate the Mix type. 12. Remove the distance and bearings from the Location map. See redlines. 13. Plan Symbols and Abbreviations will be accepted only as per the PC/COT Standard Details for Public Improvement 2003 Edition. Use the recommended line weight and line type to indicate existing, proposed objects. Std. Dtl. 100 Existing lines shall be dashed and gray in color. 14. Follow the City of Tucson, Engineering Division Active Practice Guidelines for Drafting Standards for the preparation of Project Plans, Office Procedure No. 8-1552-002. (attached). 15. Sheet 2, Indicate a full right-of-way width cross section detail with dimensions, labels, existing and proposed structures for 6th Ave. Include all dedicated easements. 16. Hinge points of cut and fill slopes must have a minimum setback of two feet from right-of-way. (Slope on private side). D.S. 11-01.9.0 (9.2, 9.3 & Figure 2) Indicate this information in cross section detail. 17. Existing pavement thickness and surface treatment shall be matched. Indicate this information in cross section detail when calling out "Saw-cut". 18. For the 1' Saw-cut areas along the curb line and median, indicate the Beginning & Ending Stationing, Offset and Grade every fifty feet. Use a light hatch symbol to indicate Saw-cut area. See redlines. 19. Delineate existing & proposed ADOT & COT right-of-way, Centerline, Property line, utilities, easements, drainage structures. Please follow the City of Tucson, Engineering Division Active Practice Guidelines for Drafting Standards for the preparation of Project Plans, Office Procedure No. 8-1552-002. (attached). 20. Proposed curve data does not coincide with the Tentative Plat. 25' Radii curb returns are required per D.S. 3-01.3.2.C, D.S. 3-01.10.Fig.6 & T.AM.G. 5.5.Table 5-2. Correct. 21. Indicate a dimensioned detail for each type of curb access ramp to be built as part of the project must be shown. Truncated Domes required. 22. Indicate the finish surface treatment for median. Reference Standard Detail. 23. Indicate that the maximum cross slope for the pedestrian access route across the driveway is 2%. 24. Any improvements within ADOT rights-of-way is required to be reviewed and approved by ADOT. An approval letter from ADOT is required for our records. 25. See redlines for additional corrections. |
| 08/19/2008 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. The City of Tucson has existing irrigtion lines, a tree and tree grate within the area to be removed. 2. Please submit a landscape and irrigation plan to mitigate the impacts. Relocate existing tree or provide new 24" box. Relocate tree grate to a location north of the new drive. 3. The sidewalk and median island hardscape must match existing concrete headers and pavers. 4. Provide 4" PVC sleeving under new paving, and relocate irrigation line. Match existing irrigation equipment/materials. |
| 09/12/2008 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | September 12, 2008 ACTIVITY NUMBER: T08PI00022 PROJECT NAME: Circle K PROJECT ADDRESS: 3301 S 6th Avenue PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 3. Provide an end median signage treatment per PCDOT & TDOT Signing Manual (2002) Chap 9-4A & 9-4B. 4. Re-stripe the bike lane along 6th Avenue at the access point into this development per PCDOT & TDOT Pavement Marking Design Manual (2003) Chapter 3-4. 5. Re-stripe the new median end/gore transition per PCDOT & TDOT Pavement Marking Design Manual (2002) Chapter 4-4 and Chapter 5-13. If possible, match the existing striping taper and location of the gore transition. 6. Show existing striping in plan view to establish tie in points for the proposed striping. The existing striping will change due to a RTA bike lane striping project slated for mid October, therefore the existing striping to be shown on the plans need to reflect the re-striping project scheduled for mid October. Contact Jose Ortiz to retrieve proposed striping plans. 7. Place the PIA and CDRC Case number on the cover sheet. 8. Add the following Signing General Notes 5(a) & 5(b) per PCDOT & TDOT Signing Manual (2002) (Chapter 1, Sheet 12) to the Plans. 9. Add the following Pavement Marking/Striping General Notes to the Plans: 'ALL STREET STRIPING & SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED STRIPING AND SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. NEW STRIPING TO BE THERMOPLASTIC MATERIAL. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.' 'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.' If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
| 09/15/2008 | SMONTIE1 | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
| 09/15/2008 | SMONTIE1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |