Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T08PI00018
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/28/2008 | SMONTIE1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | Please submit utility clearance letters. |
04/28/2008 | SMONTIE1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | Please submit utility clearance letters. |
04/28/2008 | SMONTIE1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | Please submit utility clearance letters. |
04/28/2008 | SMONTIE1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | Please submit utility clearance letters. |
04/28/2008 | SMONTIE1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | Please submit utility clearance letters. |
04/28/2008 | SMONTIE1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | Please submit utility clearance letters. |
04/28/2008 | SMONTIE1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | Please submit utility clearance letters. |
04/28/2008 | SMONTIE1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | Please submit utility clearance letters. |
04/28/2008 | SMONTIE1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | Please submit utility clearance letters. |
05/12/2008 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | May 12, 2008 SUBJECT: Country Club Road, Country Club Industrial Park, PIA T08PI0018 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Include the plan number "I-2008-020" in title block of each sheet. 2. Include Development Services Department PIA activity number "T08PI00018"on cover sheet. 3. Change title in the title blocks of sheets 2 through 5 to be identical as sheet 1. Specific sheet details may be placed above title block. 4. Sheet 2, Detail A: Indicate an 8-foot wide graded roadway shoulder with a cross slope of 2%. 5. Lighten shading used for new pavement. 6. Provide a dimensioned detail for the pavement tapers. 7. Indicate the beginning and ending for all proposed header returns. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsoz.gov |
05/14/2008 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Please submit your approved Native Plant Preservation Ordinance plan. I am looking to see if you have included the plants that will be removed within the ROW for this project. If these plants were not included in the site work you will need to address this issue. |
05/16/2008 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed this plan and have the following comments: 1. Will there be any landscaping installed with this project? If so, please submit the landscape plan to Paul Rosenboom at 4004 S. Park Avenue Bld #2 for review. 2. Typically we require concrete headers at the curb returns of strip paved roads. Will there be headers installed at the curb returns? No further comments |
05/29/2008 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | May 29, 2008 ACTIVITY NUMBER: T08PI00018 PROJECT NAME: Country Club Industrial PROJECT ADDRESS: 5990 S Country Club Rd PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 3. Show existing striping in plan view to establish tie in points for the proposed striping. 4. Place the PIA and CDRC Case number on the cover sheet. 5. Install RPM's per PCDOT & TDOT Pavement Marking Design Manual (2002). 6. Add the following Signing General Notes 5(a) & 5(b) per PCDOT & TDOT Signing Manual (2002) (Chapter 1, Sheet 12) to the Plans. 7. Add the following Pavement Marking/Striping General Notes to the Plans: 'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.' If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
05/30/2008 | SMONTIE1 | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
05/30/2008 | SMONTIE1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |