Plan Number: T08PI00015
Parcel: Unknown

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T08PI00015
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/27/2008 SMONTIE1 UTILITY CLEARANCES COT STREETS DIVISION Denied Please submit utility clearance letters.
03/27/2008 SMONTIE1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied Please submit utility clearance letters.
03/27/2008 SMONTIE1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied Please submit utility clearance letters.
03/27/2008 SMONTIE1 UTILITY CLEARANCES QUEST COMMUNICATION Denied Please submit utility clearance letters.
03/27/2008 SMONTIE1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied Please submit utility clearance letters.
03/27/2008 SMONTIE1 UTILITY CLEARANCES COX COMMUNICATION Denied Please submit utility clearance letters.
03/27/2008 SMONTIE1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied Please submit utility clearance letters.
03/27/2008 SMONTIE1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied Please submit utility clearance letters.
03/27/2008 SMONTIE1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied Please submit utility clearance letters.
04/08/2008 RICHARD LEIGH DOT ENGINEERING REVIEW Denied April 7, 2008

SUBJECT: Lodge On The Desert, PIA T08PI0015. I-2008-015

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Include the plan number "I-2008-015" in title block of each sheet.

2. Include Development Services Department PIA activity number "T08000015" on cover sheet.

3. Include the development plan number on cover sheet.

4. Include Alvernon Way, Poe Street, and Holmes Street in plan's title.

5. Provide a detail for each type of proposed curb access ramp. Additionally, indicate the use of truncated domes as the detectable warning device.

6. Add the following general note: The contractor shall contact and/or coordinate any work with COT Streets & Traffic Maintenance Division, Electric Shop (791-3154) prior to relocation or placement of any street lighting or traffic facilities. Please Contact Ernie Encinas at (791-3154) for street lighting/traffic signal plan review.

7. Indicate that a 2' minimum set back per City of Tucson Development Standard 11-09.0 is required from the hinge point of any cut and fill slope on private property and the property line.

8. Scupper details have discrepancies between them. Review and revise appropriately, see redlines.

9. Sheet 2, Detail "New pavement & curb Detail": Show sidewalk and right-of-way limits.

10. Provide a profile of the proposed right turn lane on Alvernon Way. Include elevations for all ECRs, BCRs and angle points.

11. Relocate the curb access ramp on the north side of the proposed driveway entrance on Alvernon Way to be in alignment with the proposed ramp opposite of it.

12. The existing curb access ramp on the northeast corner of Poe Street and the southwest corner of Holmes Street must be brought into compliance with current ADA requirements.

13. Provide 6' wide sidewalk along Alvernon Way between Poe street and Holmes Street. The minimum sidewalk with along a roadway listed on the City of Tucson Major Streets and Routes Plan is 6' wide.

14. If the 3" waterline shown on Poe Street a private, it must be relocated onto private property.

Please refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsoz.gov
04/18/2008 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this plan and have the following comments:

1. Sheet 2 - Detail A - Please verify the thickness of the rip rap pad. Typically the thickness si two times the D50.
2. Curb Access Ramps - Please call out the use of truncated domes for all curb access ramps.
3. Will there be any landscaping installed with this project? If so, please submitt the landscape plan to Paul Rosenboom at 4004 S. Park Ave. Bld #2 for review.
4. Please coordinate all work in the right of way with Paul Rosenboom at 791-5279 ext 234 to prevent damage to existing landscaping and irrigation.

Electrical

1. Sheet 3 - Please provide a note on the plan that calls for intercepting the existing conduit and re-routing it behind the new curb with new conductors.
2. Sheet 3 & 4 - Please provide a note to call Ed Serrias at 791-5279 ext 259 for inspection and instructions on the light pole and pull box relocation.

No further comments
04/21/2008 GARY WITTWER DOT LANDSCAPE REVIEW Approv-Cond Any landscape or irrigation within ROW must be submitted under separate permit application.
04/24/2008 SMONTIE1 PIA COORDINATOR CUSTOMER CALLED Completed
04/24/2008 JOSE ORTIZ DOT TRAFFIC REVIEW Denied April 24, 2008
ACTIVITY NUMBER: T07PI00015
PROJECT NAME: Lodge on the Desert
PROJECT ADDRESS: 306 N Alvernon Way
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal.

The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

3. Provide a 'RIGHT LANE' (R3-5F) supplemental plaque under the new (R3-5R) along Alvernon Way.

4. Place the PIA and CDRC Case number on the cover sheet.



If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
04/24/2008 SMONTIE1 PIA COORDINATOR OUT TO CUSTOMER Completed