| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/14/2008 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
| 05/27/2008 | Blanca Espino | DOT ENGINEERING | REVIEW | Denied | PIA Plan 1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word responses are unacceptable. Include plans/redlines from previous plan submittal. 2. Sheet 1, Indicate the Floodplain Use Permit activity number to General Note #22. 3. Indicate the Administrative address of the proposed site. 4. Previous comment not addressed, Plan Symbols and Abbreviations will be accepted only as per the PC/COT Standard Details for Public Improvement 2003 Edition. Refer to Detail No.100, sheets 1 thru 11. Use all that apply. Indicate symbol in legend. Existing text shall have a light pen weight. Existing symbols shall be in a dashed line type. Leaders shall be consistent for existing or proposed. See redlines. 5. Legend; use the PC/COT Standard Detail #101-Abbrevations such as: ABC, AC, AGG, BCR, ECR, EXIST. or PROP., G or GR for Grade, GB for Grade Break, HP for High Point and so on. These are standard notes. Correct and revise. See redlines. 6. The text is too small on the project map. The lettering shall be the minimum of 0.125" in height. See redlines. 7. The project map must show the full extent of the work to be done in the right of way. See redlines for corrections. 8. Sheet 2, All Stationing on plan and profile sheets should increase as you read from Left to right. Note: If a survey is inadvertently run with increasing stationing in the wrong direction (say from south to north), the stationing shall read from left to right, regardless of which way the north arrow points. Reposition plan & profile views as per Office Procedure No. 8-1552-002, Operations Plan - COT/DOT Engineering Div Active Practices Guidelines. Correct. See sheet 11 of PDF. http://www.dot.ci.tucson.az.us/engineering/pdfs/PIA%20Guidelines%20&%20Checklist.pdf 9. Sheets 2 & 3, Previous comment not addressed; Indicate the full right-of-way width. Include dimensions and details for existing and proposed structures. 10. Sheets 2 & 3, Previous comment not addressed; The structural pavement must reference the Geotechnical Report recommendation for public roads. Correct street section details. 11. Sheets 2 & 3, Previous comment not addressed, Hinge points of cut and fill slopes must have a minimum setback of two feet from right-of-way. (Slope on private side). D.S. 11-01.9.0 (9.2, 9.3 & Figure 2). Correct Details 1 of sheets 2 & 3. 12. Sheet 2 & 3; Terminal curb section is required at end of vertical curb(s). Indicate Standard Detail number and callout the proposed Stationing, Offset and beginning and ending elevations. 13. Sheet 2 & 3; Thickened edge can be used along the tapering edge instead of concrete header. Indicate a dimensioned detail. 14. Sheet 3 indicates the correct Rezoning requirement for #4 is being met. Sheet 2 must reflect the same information as sheet 3. Correct. 15. Indicate the Saw-cut Beginning, Point of Tangency, and Ending; include Stationing, Offset and Elevations. See redlines. 16. Indicate the full width of the alleyway. 17. See redlines for additional corrections. 18. Please call and setup an appointment to discuss this review. |
| 05/28/2008 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
| 05/29/2008 | SMONTIE1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
| 05/29/2008 | SMONTIE1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |