Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T08PI00006
Parcel: Unknown

Address:
251 S WILMOT RD

Review Status: Active

Review Details: PIA SUBMITTAL

Plan Number - T08PI00006
Review Name: PIA SUBMITTAL
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
02/08/2008 SMONTIE1 UTILITY CLEARANCES COT STREETS DIVISION Denied Please submit utility clearance letters.
02/08/2008 ANY PIA COORDINATOR CUSTOMER CALLED Active
02/08/2008 SMONTIE1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied Please submit utility clearance letters.
02/08/2008 ANY PIA COORDINATOR OUT TO CUSTOMER Active
02/08/2008 SMONTIE1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied Please submit utility clearance letters.
02/08/2008 SMONTIE1 UTILITY CLEARANCES QUEST COMMUNICATION Denied Please submit utility clearance letters.
02/08/2008 SMONTIE1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied Please submit utility clearance letters.
02/08/2008 SMONTIE1 UTILITY CLEARANCES COX COMMUNICATION Denied Please submit utility clearance letters.
02/08/2008 SMONTIE1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied Please submit utility clearance letters.
02/08/2008 SMONTIE1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied Please submit utility clearance letters.
02/08/2008 SMONTIE1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied Please submit utility clearance letters.
02/22/2008 GARY WITTWER DOT LANDSCAPE REVIEW Approved
02/25/2008 Blanca Espino DOT ENGINEERING REVIEW Denied PIA Plan
1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word responses are unacceptable. Include plans/redlines from previous plan submittal.

2. In title block, add assigned I-Plan Number, I-2008-008 to all sheets.

3. Indicate assigned DSD activity number T08PI00006 above title block. See redlines.

4. Project Overview layout shall be reposition with the North arrow pointing towards the top of page. See redlines.

5. Sheet 1, Indicate the Administrative address.

6. Sheet 1, Legend; Dashed lines and a light gray color shall be used to indicate existing symbols.

7. Indicate the following Paving Notes:
q Aggregate Base Course shall conform to PC/COT SSPI Section 303

q All concrete shall conform to PC/COT SSPI Section 1006, Class S, 3,000 PSI compressive strength at 28 days, unless otherwise specified.

q Pavement Section Design documentation, are in accordance to the approved Geotechnical Report, Report Name and Firm Name, Project Number.

q All Drainage Infrastructures, indicated on the plans, are in accordance to the approved Drainage Report approved by Development Services Department.

q The City shall not be held liable for any errors and/or omissions on these plans. Items not meeting City Standards shall be repaired/replaced at no cost to the City.

q The Engineer of Record shall submit for review of all changes to these plans and must be cleared and approved by the City of Tucson City Engineer's Permits and Codes Section, prior to construction. Additionally, the Engineer of Record shall certify all changes meeting all applicable standards, codes, and ordinances.

q An excavation permit shall be obtained from the City of Tucson Transportation Department prior to any work within the Public right-of-way.

q Paving Note #18 shall read; The PIA Inspector shall verify that the "Saw-cut" line is located within competent pavement. Adjustments to the plan shall be documented and As-built; a one foot minimum shall be provided.

q The extent and type of surface treatments/repairs indicated on the plans may not be all inclusive of the work that is needed. Additional repairs, paving, or replacement may be needed depending on field conditions.

q Paving Note #8 shall read; Contractor shall call Blue Stake as mandated by the Arizona Revised Statutes at 1-800-782-5348 before any construction begins to verify location of existing utilities shown or not shown. Existing utility locations shown hereon are only approximate. It is the contractor's responsibility to confirm horizontal and vertical location of all utilities without damaging same. Damaged utilities shall be repaired at no expense to the City.

q Upon commencement of work, traffic control devices shall be posted and maintained by the contractor until such time as the work is completed. All warning signs barricades etc. shall be in accordance with the manual on uniform traffic control devices adopted by the State of Arizona pursuant to A.R.S. 28-065. Contact Traffic Engineering, 791-4259, 48-hours prior to placing or removing any said traffic control devices.

q Signage and striping should be coordinated with Traffic Engineering and installed at no expense to the public. Call Traffic Engineering at 791-4259 prior to the installation or removal of striping and signage.

q Floodplain Use Permit No._______, has been issued by Development Services Department for work impacting City and FEMA Floodplains.

8. A Floodplain Use Permit is required as per FIRM Panel 2253. See DSD Engineering for FUP application and submittal.

9. All Rezoning requirements pertaining to the rights-of-way must be met. Contact Andy McGovern at 837-6626 for a cost estimate of the In-Lieu Fees agreement as per the approved Development Plan D07-0012.

10. Sheet 2; Roadway profiles are required for new roadways, including widening projects, deceleration, acceleration and turn lanes. Refer to COT/Engineering Division Active Practices Guidelines No. 8-1552-002

11. Sheet 2, Detail A; Existing pavement thickness and surface treatment shall be matched. Indicate measurement for AC/ABC. Show a dimensioned detail.

12. Indicate Saw-cut Beginning & Ending; Stationing, Offset, & Elevation. Indicate grades every 30LF at Saw-cut. See redlines.

13. Differing structural pavement sections on plan shall be specific to each street affected. Include a dimensioned pavement structural section for each. Indicate Mix # / Effective air voids (Per SSPI), 5.5% MSR, 4.0% Local.

14. Plan view; North is positioned incorrectly. See redlines.

15. Indicate property lines and right-of-way limits.

16. See redlines for additional corrections.


Once changes, modifications, and or corrections are made to the PIA plan resubmitted and reviewed, further comment may result. If you have any questions, I can be reached at 837-6634 or Blanca.Espino@tucsonaz.gov
02/29/2008 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this plan and have the following comments:

1. Sheet 2 - Is the pork chop shown at the dirveway at station 20+54 new or existing? If it is new, additional information will be needed for construction. If it is existing, why have you called out to sawcut?
2. It appears that there a couple of new curb access ramps that have not been called out.
3. The north arrow is in the wrong direction.
4.Sheet 2 - Detail A - This detail shows 5" of AC proposed for the new turn lane and it also says to match the existing pavement section. I would match the existing pavement section unless the section is less than the proposed 5" of AC.
5. Will there be any proposed landscaping with this project? If so, please submit the landscape plan to Paul Rosenboom at 4004 S. Park Ave, Bld #2 for review.
6. All work in the right of way needs to be coordinated with Paul Rosenboom at 791-5279 ext 234 to prevent damage to existing landscaping and irrigation.

No further comments
03/12/2008 JOSE ORTIZ DOT TRAFFIC REVIEW Passed No PIA review needed. The design for the right turn lane will be added to the Wilmot Rd. at Park Place Intersection Upgrade capital improvement project.