Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T08PI00005
Parcel: Unknown

Address:
8525 E 22ND ST

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T08PI00005
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/28/2008 SMONTIE1 UTILITY CLEARANCES COT STREETS DIVISION Completed Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A.
Thank You
10/28/2008 SMONTIE1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A.
Thank You
10/28/2008 SMONTIE1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A.
Thank You
10/28/2008 SMONTIE1 UTILITY CLEARANCES QUEST COMMUNICATION Completed Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A.
Thank You
10/28/2008 SMONTIE1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A.
Thank You
10/28/2008 SMONTIE1 UTILITY CLEARANCES COX COMMUNICATION Completed Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A.
Thank You
10/28/2008 SMONTIE1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A.
Thank You
10/28/2008 SMONTIE1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A.
Thank You
10/28/2008 SMONTIE1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A.
Thank You
11/20/2008 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
11/24/2008 JOSE ORTIZ DOT TRAFFIC REVIEW Approved
12/05/2008 Blanca Espino DOT ENGINEERING REVIEW Denied PIA Plan
1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word responses are unacceptable. Include plans/redlines from previous plan submittal.

2. Reminder: Recording information of Maps and Plats, Book and Page must be noted on cover sheet of subdivision street improvement plans. Plat must be recorded before submittal of mylars for final review and approval. See redlines.

3. Sheets 1 through 8: Page numbering text size for Paving Improvement plans is equal to or greater than 1/8 inch in height (125 point). See redlines.

4. Previous comment: A Floodplain Use Permit is required for work along and or within the Palm Tree Drive Wash. Application can be picked up and submitted for review to Development Services Engineering.

5. Add note to General Construction Notes and indicate the assigned FUP activity number: Floodplain Use Permit No._______, has been issued by Development Services Department for work impacting City and FEMA Floodplains.

6. Sheet 2, Detail 1; Callout curb transition. See redlines.

7. Sheet 3, Profile; 22nd Street, See redlines for corrections.


8. Sheet 5, Ramps located at located at the "T" turnaround shows to be different. A dimensioned detail for curb access ramp to be built as part of the project must be shown.

9. Sheet 5, Indicate the "T" turnaround two curve returns data in the Curve Data Table. See redlines.

10. Sheet 5, Previous comment: All Easements, dedications, right-of-way should be depicted in plan view and labeled with recordation information (docket/page or plat book/page). See redlines.

11. DSMR, DS08-13, approved on 03/19/2008 by Matt Flick as noted; DSD Engineering has no objection to approval of a DSMR to Dev. Std. 3-01.6.2.C.2 (& Figure 23) for a hammerhead with an angle of less than 90 degrees (approx. 68 degrees).

12. The "T" turnaround/hammerhead require a four (4) foot minimum setback from the property line on all sides. D.S. 3-01.10.Figure 23. See redlines for correction.

13. See redlines for additional corrections.

Once changes, modifications, and or corrections are made to the PIA plan resubmitted and reviewed, further comment may result. If you have any questions, I can be reached at 837-6634 or Blanca.Espino@tucsonaz.gov
12/08/2008 SMONTIE1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
12/08/2008 SMONTIE1 PIA COORDINATOR OUT TO CUSTOMER Completed