Review Details: PIA RESUBMITTAL
Plan Number - T08PI00005
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/28/2008 | SMONTIE1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A. Thank You |
10/28/2008 | SMONTIE1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A. Thank You |
10/28/2008 | SMONTIE1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A. Thank You |
10/28/2008 | SMONTIE1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A. Thank You |
10/28/2008 | SMONTIE1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A. Thank You |
10/28/2008 | SMONTIE1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A. Thank You |
10/28/2008 | SMONTIE1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A. Thank You |
10/28/2008 | SMONTIE1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A. Thank You |
10/28/2008 | SMONTIE1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | Please submit Utility Clearance Letters for: Kinder Morgan Energy and El Paso Natural Gas, if not applicable we still need the letter receipt showing N/A. Thank You |
11/20/2008 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
11/24/2008 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approved | |
12/05/2008 | Blanca Espino | DOT ENGINEERING | REVIEW | Denied | PIA Plan 1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word responses are unacceptable. Include plans/redlines from previous plan submittal. 2. Reminder: Recording information of Maps and Plats, Book and Page must be noted on cover sheet of subdivision street improvement plans. Plat must be recorded before submittal of mylars for final review and approval. See redlines. 3. Sheets 1 through 8: Page numbering text size for Paving Improvement plans is equal to or greater than 1/8 inch in height (125 point). See redlines. 4. Previous comment: A Floodplain Use Permit is required for work along and or within the Palm Tree Drive Wash. Application can be picked up and submitted for review to Development Services Engineering. 5. Add note to General Construction Notes and indicate the assigned FUP activity number: Floodplain Use Permit No._______, has been issued by Development Services Department for work impacting City and FEMA Floodplains. 6. Sheet 2, Detail 1; Callout curb transition. See redlines. 7. Sheet 3, Profile; 22nd Street, See redlines for corrections. 8. Sheet 5, Ramps located at located at the "T" turnaround shows to be different. A dimensioned detail for curb access ramp to be built as part of the project must be shown. 9. Sheet 5, Indicate the "T" turnaround two curve returns data in the Curve Data Table. See redlines. 10. Sheet 5, Previous comment: All Easements, dedications, right-of-way should be depicted in plan view and labeled with recordation information (docket/page or plat book/page). See redlines. 11. DSMR, DS08-13, approved on 03/19/2008 by Matt Flick as noted; DSD Engineering has no objection to approval of a DSMR to Dev. Std. 3-01.6.2.C.2 (& Figure 23) for a hammerhead with an angle of less than 90 degrees (approx. 68 degrees). 12. The "T" turnaround/hammerhead require a four (4) foot minimum setback from the property line on all sides. D.S. 3-01.10.Figure 23. See redlines for correction. 13. See redlines for additional corrections. Once changes, modifications, and or corrections are made to the PIA plan resubmitted and reviewed, further comment may result. If you have any questions, I can be reached at 837-6634 or Blanca.Espino@tucsonaz.gov |
12/08/2008 | SMONTIE1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
12/08/2008 | SMONTIE1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |