Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T08PI00004
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/30/2008 | SMONTIE1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | Please submit utility clearance letters. |
01/30/2008 | SMONTIE1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | Please submit utility clearance letters. |
01/30/2008 | SMONTIE1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | Please submit utility clearance letters. |
01/30/2008 | SMONTIE1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | Please submit utility clearance letters. |
01/30/2008 | SMONTIE1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | Please submit utility clearance letters. |
01/30/2008 | SMONTIE1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | Please submit utility clearance letters. |
01/30/2008 | SMONTIE1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | Please submit utility clearance letters. |
01/30/2008 | SMONTIE1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | Please submit utility clearance letters. |
01/30/2008 | SMONTIE1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | Please submit utility clearance letters. |
02/08/2008 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Please add the following note to the Paving Notes #14 on sheet 2. The City irrigation system can not be shut down for construction longer that 30 days. All plant material must be evaluated for transplant or salvage by the contractor and COT Landscape Architect (791-5100) prior to construction. All irrigation lines, wire and equipment to be relocated must be inspected by COT Landscape Architct and Streets. All pipe under paving must be sleeved in PVC Sch, 40 pipe. |
02/11/2008 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed this plan and have the following comments: 1. Sheet 2 - Note 1 and 18 are the same. 2. Will there be any landscaping installed with this project? If so, please submit the plan to Paul Rosenboom at 4004 S. Park Ave Bld #2 for review. 3. Sheet 3 - Pavement Structural Section - Typically a 1" mix is not used as a finishing course. Please verify that is the case. 4. Sheet 4 - Is there access to the Julian Wash for maintenance? 5. Sheet 4 - Detail C - Is Common Area "A" to be privately maintained? 6. Sheet 5 - what is proposed for the median islands? Will there be landscaping, brushed concrete, or something else? 7. Sheet 6 - Several new curb access ramps are missing construction notes and leaders. 8. Will you be striping a bike lane with these improvements? No further comments. |
02/22/2008 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | February 22, 2008 SUBJECT: Kolb Road, Off-Site Improvements for La Estancia of Tucson, PIA T08PI0003 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Include the plan number "I-2008-006" in title block of each sheet. 2. Include Development Services Department PIA activity number (T0800004) on cover sheet. 3. Make the lighting plan part of the plan set. 4. Include a note requiring the contractor to coordinate the relocation or placement of any street lighting with the City of Tucson, Electric Shop (520-791-3154). Please Contact Ernie Encinas at 520-791-3154 for street lighting plan review. 5. Sheet 3, Pavement structural detail: The final surface treatment must be a Mix No. 2 or Mix no. 3. Please provide a copy of the geotechnical report supporting the proposed pavement structural section with next submittal. 6. Cross sections are not all representative of cross section call out sections. Verify and revise as required. 7. Provide additional details (size & type) for the proposed scupper relocation at Sta. 14+28, RT & 17+80, RT (Kolb Road). 8. Clarify the beginning and ending of the proposed pavement taper on the west side of Kolb Road. Labeling for beginning and ending of the pavement taper is conflicting. 9. Provide additional information for the proposed relocation of the guardrail between Sta. 29+30 and 39+35 (Kolb Road). Provide Stationing and offsets for beginning, ending and any angle points and show guardrail in applicable cross section. 10. Why is sidewalk not being provided along the entire frontage of the subdivision per Development Standard 3-01.3.3? Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsoz.gov |
03/14/2008 | SMONTIE1 | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
03/14/2008 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | March 14, 2008 ACTIVITY NUMBER: T08PI00004 PROJECT NAME: Kolb Improvements-La Estancia PROJECT ADDRESS: 7600 S Kolb Rd PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. See numerous redline sheets on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 3. Place the PIA Case number on the cover sheet. 4. Add the following Pavement Marking/Striping General Notes to the Plans: 'ALL STREET STRIPING & SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED STRIPING AND SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. NEW STRIPING TO BE THERMOPLASTIC MATERIAL. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.' 'ALL NON-SIGNALIZED INTERSECTION STREET NAMES MUST HAVE E-W BLOCK NUMBER ADDRESSES FOR E-W ROADWAYS AND N-S BLOCK NUMBER ADDRESSES FOR N-S ROADWAYS.' 'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.' 'ALL WARNING SIGN PANELS SHALL BE FLUORESCENT YELLOW DIAMOND-GRADE (DG-CUBED OR EQUIVALENT) SHEETING. ALL SCHOOL ZONE SIGNS SHALL BE FLUORESCENT YELLOW-GREEN DIAMOND GRADE (DG-CUBED OR EQUIVALENT) SHEETING. ALL OTHER SIGN PANELS SHALL HAVE HIGH INTENSITY PRISMATIC TYPE IV SHEETING.' If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
03/14/2008 | SMONTIE1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |