Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: ELECTRICAL
Permit Number - T08EL00666
Review Name: ELECTRICAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/22/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T08EL00666 4/22/08 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006. 2. Please show calculations to justify the figure of 64.8 KVA for the mobile home feeders. Per NEC 550.31, in order to use the demand factors in the Table, 16,000 VA has to be attributed to each lot, the load has to be calculated according to 550.18, and the largest of the two shall be used. 3. Demand factor used for G-1 would be 0.25, not 0.24. 4. May not apply demand factor to the Log Building. 5. The #1 GROUND on the line side of the service disconnect is redundant. The third 350 MCM will carry any fault current back to the source. |