Permit Review Detail
Review Status: Completed
Review Details: ELECTRICAL
Permit Number - T08EL00120
Review Name: ELECTRICAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/25/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T08EL00120 1/25/08 1. Apply for a waiver to add new overhead electrical services. 2. Grounding electride conductor with 350 MCM service entrance conductors is #2, not #4. Reference NEC 250.66. 3. Provide conduit and conductor size and type for ENT Panel. 4. (2220 SF) X 3W = 6.7 KW, not 3.7. 5. Cooler is not subject to the demand factor. Reference NEC 220.82 (C). 6. Put oven on panel schedule since it is on the load calculation ENT Panel. 7. Put cooktop on panel schedule since it is on the load calculation ENT Panel. 8. Divisor for load calculations is the system voltage, or 240V, not 230V. 9. Modify typical panels as necessary. |