Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T08CM03994
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/16/2010 | MARTIN BROWN | FIRE | REVIEW | Denied | Unable to locate response letter to previuos comments, which were: No Parking - Fire Lane signs required. See Appendix D of the C.O.T. amendments to the 2006 IFC for location and spacing requirements. Also, please relocate Fire Deparment Connection out from under the canopy. |
06/16/2010 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED COT PERMIT FOR ON-SITE PRIVATE SEWER(MULTIPLE BUILDINGS WITH PRIVATE SEWER MANHOLES)- NEED DEQ REVIEW & APPROVAL OF ON-SITE PRIVATE SEWER- NEED 3RD FLOOR WASTEWATER REVIEW & APPROVAL OF CONSTRUCTING A NEW MANHOLE OVER AN EXSISTING 24" PUBLIC SEWER- NEED COPY OF ON-SITE PRIVATE SEWER FOR BASE MAP UPDATE NEED TO PERMIT SEPTIC TO SEWER FOR EXSISTING BUILDINGS #1 THRU #7. |
06/21/2010 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 06/21/2010, The subject submittal has been reviewed. It can not be approved at this time. Address the following comments before the next submittal: 1- Revise the proposed building minimum finished floor elevation to 2542.85' as required by Floodplain Use Permit #T09OT01433. 2- This project is required to submit two elevation certificates (El Cert's) as stated in Condition #5 of Floodplain Use Permit #T09OT01433. Ensure that a preslab El Cert is completed and submitted to the Planning and Development Services Department (PDSD) before the slab is poured. Another El Cert is also required to be submitted to PDSD for the completed structure before the issuance of a certificate of occupancy. |
06/22/2010 | TERRY STEVENS | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/09/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |
09/09/2010 | SUE REEVES | REJECT SHELF | Completed |