Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T08CM03980
Parcel: 135084470

Address:
7230 E 22ND ST

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM03980
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2009 BIANCA RAMIREZ ENGINEERING REVIEW Approved
01/07/2009 MARTIN BROWN FIRE REVIEW Approved
01/07/2009 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
01/16/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Clarify which code is to be used for this activity; both the IPC and the UPC are referenced on the architectural and on the plumbing sheets. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC.
01/16/2009 ROBERT SHERRY WATER REVIEW Approved
01/16/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top heat pumps, the evaporative cooler, and the exhaust fans. Provide details of any required modifications to the roof structure. Reference: Section 302.1, IMC 2006.
2. If the top of the roof parapet is less than 42" above the roof surface, provide guards for equipment (e.g. EF-3) located within 10 feet of the roof edge. Reference: Section 304.10, IMC 2006.
3. Revise the termination point of the water heater flue to comply with Section 510.6.2.6, UPC 2006 (i.e. at least 3 feet above any forced air inlet located within 10 feet of the flue).
4. Show that the make up air duct within 18" of the Type I exhaust hood complies with the requirements of Section 506.3.1.2, IMC 2006.
5. Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.6, IMC 2006. Reference: Section 302.1, IMC 2006.
6. The total exhaust volume for the hood is 4400 CFM but only 3500 CFM of make up air is being supplied by EC-1. Where is the remaining 900 CFM of make up air coming from? Provide adequate make up air for the kitchen exhaust hood. Reference: Section 508.1 IMC 2006.
7. Clarify the type of fan being specified for EF-3 and EF-4. A model VCR-165 is a centrifugal upblast fan manufactured by the Loren Cook Company but the details show a utility set. Reference: Section 106.3.1, IMC 2006.
8. Clarify the design of the rain guard shown on detail 103/M3.0. Reference: Section 106.3.1, IMC 2006.
01/27/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
01/28/2009 GERRY KOZIOL WWM REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
01/29/2009 THAUSER1 OUT TO CUSTOMER Completed