Permit Number: T08CM03840
Parcel: 12617138B

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM03840
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
12/09/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
12/10/2008 SREEVES1 ADA REVIEW Passed
12/12/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 12 DECEMBER 2008
T08CM03840/ARIZONA CENTRAL CREDIT UNION
REVIEWED BY RON BROWN

STRUCTURAL AND ACCESSIBLE REVIEW
2006IBC/ICC ANSI 117.1

DENIED: SEE COMMENTS BELOW

A. SHEET TS:
1. THE SITE INFORMATION SCHEDULE INDICATES THREE ACCESSIBLE PARKING SPACES ARE REQUIRED WHERE THE ATTACHED EXISTING SITE PLAN SHOWS ONLY TWO ACCESSIBLE PARKING SPACES. AS PART OF THE 20% ACCESSIBLE UP GRADE REQUIREMENT BY IBC 2006 IBC, SECTION 3409.7.1. DO YOU INTEND TO ADD ANOTHER ACCESSIBLE PARKING SPACE? IF SO, PLEASE PROVIDE DETAILED SITE PLAN AND PARKING AND ACCESS PLAN DETAILS AS PER ICC 117.1 CHAPTERS 4 AND 5
2. AS PER DSD PERMIT REVIEW STANDARDS, LETTERING FOR ALL DRAWINGS IS TO BE A MINIMUM OF 1/8" IN HEIGHT. 3/32" FONT SIZE MAY BE USED IF APPROVED BY THE BUILDING OFFICIAL. EITHER CHANGE ALL LETTERS TO 1/8" OR PROVIDE AN APPROVED APPEAL FOR 3/32" USAGE FROM THE BUILDING OFFICIAL.
3. PROVIDE A BUDGET BREAKDOWN SHOWING ACCESSIBLE UPGRADE EXPENDITURES OF NO MORE THAN 20% OF THE OVERALL CONSTRUCTION BUDGET AS PER 2006 IBC, SECTION 3409.7.1.

B. SHEET A2.3:
1. AS STATED BY NOTE ON ROOFING PLAN, ALL ROOFING SCOPE OF WORK, DETAILS AND SPECIFICATIONS ARE DIFFERED FOR SUBMITTAL AT A LATER DATE BY THE ROOFING SUBCONTRACTOR. ALL DIFFERED SUBMITTALS NEED NOTIFICATION TO THE BUILDING OFFICIAL. PLEASE PROVIDE A COPY OF THE DIFFERED CORRESPONDENCE TO THE BUILDING OFFICIAL IN THE PERMIT PACKAGE.
2. AT ROOFING PLAN DETAIL 1/A2.3:
a. CORRECT THE NOTE ARROW TO MASONRY PARAPET
b. PROVIDE A NEW NOTE TO THE STUCCO FASCIA AND PARAPET
c. SHOW NEW ROOFING OVERHANG SECTION DETAIL REFERENCES
3. AT EXTERIOR ELEVATION DETAIL 2/A2.3:
a. SHOW NEW FASCIA/OVERHANG SECTION DETAIL REFERENCES
4. WHERE ARE OTHER EXTERIOR DEMO AND MODIFIED ELEVATION DETAILS?

C. SHEET A8.2:
1. AT DETAIL 6C/A8.2: SHOW THE REQUIRED VERTICAL GRAB BAR AS PER ICC ANSI 117.1, SECTION 604.5.1.

END OF REVIEW
12/12/2008 RONALD BROWN ZONING HC SITE REVIEW Denied REFERENCE THE BUILDING FOLDER FOR ACCESSIBLE COMMENTS
12/26/2008 GERRY KOZIOL WWM REVIEW Approved
12/31/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Show how the temperature of the hot water supply to the public lavatories is controlled to a maximum of 110 degrees Fahrenheit. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006
12/31/2008 ROBERT SHERRY WATER REVIEW Approved
12/31/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
01/08/2009 GERARDO BONILLA OUT TO CUSTOMER Completed
01/08/2009 SUE REEVES REJECT SHELF Completed