Permit Number: T08CM03705
Parcel: 105110670

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM03705
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/21/2008 ROBERT SHERRY WATER REVIEW Approved
11/24/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved 1. SHEET G001:
A. CORRECT ACCESSIBILITY REFERENCE CODE TO
2006 IBC, CHAPTER 11 AND ICC/ANSI 117.1
B. CORRECT ELECTRICAL CODE REFERENCE TO 2005
NATIONAL ELECTRICAL CODE
2. DETAIL 4/A101: CLEARIFY SECTION SHOWN FOR
WATER HEATER AND MOP SINK. IT DOES NOT
REFLECT DESIGN SHOWN ON FLOOR PLAN,
ELEVATIONS AND PLUMBING PLAN.
11/24/2008 RONALD BROWN ZONING HC SITE REVIEW Passed 1. INSURE 2'-10" HIGH ACCESSIBILITYN PORTION OF SALES DESK AS PER ANSI 117.1, SECTION 904.
11/24/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
11/26/2008 GERRY KOZIOL WWM REVIEW Approved
11/26/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved 1. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC.
2. Revise the north arrow on the plumbing plan to show the correct orientation of the building. Reference: Section 103.2.3, UPC 2006.
3. Provide details and structural calculations to show how the proposed water heater is to be supported from the building structure in an "approved manner". Reference: Section 314.5, UPC 2006.
4. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006.
11/26/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved 1. Provide energy code compliance calculations for the building envelope. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006.
2. The 2006 International Building Code with Local Amendments and the 2006 International Energy Compliance Code with Local Amendments are the relevant codes for this project (see items 7A and 11 in the Mechanical Specifications, sheet M103).