Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T08CM03698
Parcel: 127030200

Address:
5550 E 1ST ST

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM03698
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/18/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
11/18/2008 DAVE MANN FIRE REVIEW Denied Please include the following design criteria to the plans.
1. Flow data (static pressure, residual pressure, GPM)
Available from the Fire Department (520) 791-3234
2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D)
3. The hazard classification of the building, including any special hazards.
4. The density required of the water supply.
Also, note on sheet CVR incorrectly states sprinkler system to designed to R4/I4 occupancy. Please revise.
11/19/2008 ERIC NEWCOMB ZONING HC SITE REVIEW Denied 1. SEE BUILDING COMMENTS.
11/19/2008 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. 1/8" LETTERING IS REQUIRED ON ALL DRAWINGS UNLESS A WRITTEN APPEAL FOR 3/32" LETTERING IS APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS. THIS APPROVED APPEAL MUST ACCOMPANY THE DRAWINGS SUBMITTED FOR CHECKING.
2. SHEET A1.0; FLOOR PLAN: DRINKING FOUNTAIN MUST BE HIGH/LOW OR SINGLE POINT-OF-USE PER IBC 1109.5.1.
11/19/2008 ENEWCOM1 ADA REVIEW Passed
11/24/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide the specifications for the proposed exhaust fans for the restrooms. Ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. Reference: Table 403.3, IMC 2006.
11/24/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the plumbing notes on sheet P1.0 to apply to this project. This project is not residential and the IRC does not apply. Remove the notes that indicate the installation of equipment and appliances that are not shown on the plans. Reference: Section 103.2.3, UPC 2006.
2. If the owner/contractor is allowed to "substitute other piping or piping systems", a revision to the drawings will be required prior to final inspection. Reference: Section 103.2.3, UPC 2006.
3. Provide water supply isometrics. Reference: Section 103.2.3, UPC 2006.
4. Provide fixture descriptions for all plumbing fixtures. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, UPC, etc). Reference: Sections 301.1.1 and 401.1, UPC 2006.
5. Show how the wall hung fixtures are to be mounted, in compliance with the requirements of Section 407.4, UPC 2006.
6. Clarify the difference between the waste water piping as shown in the original building drawings and the new drawings for the revised restroom. Which is correct? Reference: Section 103.2.3, UPC 2006.
7. Provide a floor drain in each of the restrooms. Reference: Section 411.2, UPC 2006.
8. Specify that the temperature setting for the thermostatic mixing valves for the lavatory faucets are to be adjusted to a maximum delivery temperature of 110 degrees Fahrenheit. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
9. The water supply pipe size called out for the urinal will result in a water velocity greater than 8 FPS (urinals have a 15 GPM demand during the flushing cycle). Limit the water velocity to less than 8 FPS for the copper piping. Reference: Section A 6.1, UPC 2006 and IS 3-2003, Section 2.6.
11/24/2008 ROBERT SHERRY WATER REVIEW Approved
11/28/2008 MICHAEL ST. PAUL ZONING REVIEW Needs Review
12/11/2008 GERRY KOZIOL WWM REVIEW Approved
12/11/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
02/23/2009 DELMA ROBEY OUT TO CUSTOMER Completed