Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 2ND
Permit Number - T08CM03574
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/18/2009 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/18/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PROVIDE THE LATEST SET OF APPROVED DRAWINGS ALONG WITH THIS REVISED SET. 2. SHEET A7.04: IS THIS A NEW SHEET? IT IS NOT REFERENCED IN THE DRAWING INDEX ON THE TITLE SHEET TS1.01. CLARIFY. 3. STRUCTURAL CALCULATIONS: IS THE EQUIPMENT PLATFORM MEZZANINE FRAMING PLAN REVISED? THE CALCULATIONS INDICATE IT IS. SEE NOTE 1. |
06/22/2009 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Costco - 6255 E. Grant Road T08CM03574-R Building Plan - 2nd Revision (1st Review) TRANSMITTAL DATE: June 22, 2009 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning acknowledges that a revised development plan has been submitted. Until the revised development plan has been approved the Zoning Review section will not be able to approve the building plans. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped revised development plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t08cm03574-2ndR.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
06/23/2009 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Denied | DSD TRANSMITTAL FROM: Bianca Ramirez, CFM Engineering Associate PROJECT: Costco - 6255 E. Grant Road T08CM03574-R Building Plan - 2nd Revision (1st Review) TRANSMITTAL DATE: June 23, 2009 1. The building plan has been reviewed by the Engineering Section but cannot approve the plan until all the Development plan comments and/or concerns have been addressed. 2. Zoning acknowledges that a revised development plan has been submitted. Until the revised development plan has been approved the engineering and zoning sections, the engineering section will not be able to approve the building plans. 3. Engineering will re-review the building plan on the next submittal to insure compliance with the approved and stamped revised development plan. 4. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Bianca.Ramirez@tucsonaz.gov or (520) 837-4928 |
06/26/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a copy of the approved construction plans for comparison with the revised plans. Cloud all of the changes that have been made to the approved plans; not just the "owner revisions" issue. Reference: Section 103.2.3, UPC 2006. 2. Revise the overflow drain to include a strainer (Detail 4/7.01). Reference: Section 1105.2, UPC 2006. 3. Show how the roof of the mechanical room (106) is to be drained or provide structural calculations to show that the roof can support the weight of water that will accumulate with no roof drain. Reference: Section 1611.1, IBC 2006. 4. Revise the weir overflow shown in the roof conductor head (detail 4/A2.02) to have the same capacity as the scupper. Reference: Section 1101.11.2, UPC 2006. |
06/26/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/26/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide a copy of the approved construction plans for comparison with the revised plans. Cloud all of the changes that have been made to the approved plans; not just the "owner revisions" issue. Reference: Section 106.3.1, IMC 2006. 2. Condensate drains may not terminate over or into a roof drain or gutter unless the roof drain or gutter terminates at or above grade in an area capable or absorbing the condensate flow without surface drainage (Detail 81/P-4.1). Reference: Section 307.2.1, IMC 2006, as amended by the City of Tucson. |
06/30/2009 | GERRY KOZIOL | WWM | REVIEW | Passed | |
07/10/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project; 6255 E GRANT RD T08CM03574 Costco Revisions The Electrical Plans have been denied for the following; 1. Provide a copy of the previously approved plans in order to compare the existing with the new revised. Ray T Majuta, Elect Plan CK PDS, City of Tucson, 7/11/09, Ray.Majuta@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/30/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |
07/30/2009 | SUE REEVES | REJECT SHELF | Completed |