Permit Number: T08CM03574
Parcel: 110162190

Address:
6255 E GRANT RD

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T08CM03574
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/09/2009 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed Impact Fee's Do Apply; East District; 9,619 Square Foot Addition;

Permit Pulled Before 1/16/2009 = $39,276.28
Permit Pulled On or After 1/16/2009 = $51,078.79
01/09/2009 SREEVES1 ADA REVIEW Passed
01/12/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET 5.01.4; DETAIL 11: PROVIDE SIZE OF UNISTRUT SUPPORTS AND CONNECTIONS (SIZE AND QUANTITY) TO UNISTRUT HEADER (ABOVE) AND MOUNTING PLATE (BELOW). PROVIDE UNISTRUT HEADER SIZE AND CONNECTIONS (SIZE AND QUANTITY) TO ROOF JOISTS. PROVIDE UNISTRUT BRACE SIZE AND CONNECTIONS (SIZE AND QUANTITY) TO ROOF JOISTS (ABOVE) AND MOUNTING PLATE (BELOW).
2. SHEET A5.07; ELEVATION 2: PER IBC SECTION 1109.5, HIGH/LOW DRINKING FOUNTAIN IS REQUIRED. SEE ANSI 602.4 FOR SPOUT OUTLET HEIGHTS.
3. SHEET A5.07 (SECTION 8); SHEET A5.08 (SECTION 18): PROVIDE CONNECTION (SIZE AND QUANTITY) AT TOP AND BOTTOM OF METAL STUD WALL TO RESIST LATERAL LOADS REQUIRED BY IBC SECTION 1607.13.
4. SHEET A7.02; SECTION 16: SEE NOTE 3.
5. SHEET S0.1; LIGHT POLE BASE: IF LIGHT POLE BASE EXCEEDS 20' IN HEIGHT, CALCULATIONS ARE REQUIRED FOR THE FOUNDATION AND ANCHORS.
6. SHEET S1.1; FOUNDATION PLAN: CLARIFY SECTION CUTS ON THE EAST WALL OF THE RECEIVING AREA (2 THUS).
7. SHEET S1.2; FRAMING PLAN: IN THE PRODUCE COOLER AREA, PROVIDE TOP OF FRAMING ELEVATIONS.
8. SHEET S1.2; SHEET S5.1: IN THE PRODUCE COOLER AREA, SECTION K-5.1 INDICATED ON PLAN IS NOT ON S5.1. CLARIFY.
9. SHEET S3.1; SECTION H-3.1: PROVIDE LOCATION ON PLANS FOR THIS SECTION.
10. SHEET S2.2: PROVIDE LOCATIONS ON PLAN FOR THIS SHEET.
11. SHEET S3.1; NEW OPENINGS PLAN: DID NOT LOCATE CALCULATIONS FOR THIS NEW LINTEL. VERIFY.
01/12/2009 DAVE MANN FIRE REVIEW Approved
01/13/2009 ERIC NEWCOMB ZONING HC SITE REVIEW Denied 1. SEE BUILDING COMMENTS.
01/27/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 103.2.3, UPC 2006.
2. Clarify where detail 11/A5.01.5 occurs and how the standpipe receptor complies with the requirements of Section 804.1, UPC 2006. Reference: Section 103.2.3, UPC 2006.
3. Clarify how the deck drain (D-6) for the cooling tower will prevent rainwater from being introduced into the sanitary drain system. Reference: Section 306.2, UPC 2006.
4. Provide a vacuum relief for storage-type water heaters located above any fixture outlets (WH-1 and WH-2). Reference: Section 608.7, UPC 2006.
5. Per Tucson Water, the pressure range for the project address is 86 - 93 PSI. A pressure regulator is required to reduce the pressure to no more than 80 PSI. Revise the water pressure calculations, using the reduced pressure from the regulator as a starting point.
6. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks require cleanouts regardless of length). Reference: Section 707.4, UPC 2006.
7. Clarify the uses for the multiple-compartment sinks (E-18, E-22, and E-23). An indirect connection shall be used for the sanitizing and food prep compartments only. Reference: Sections 304.0 and 801.2.3, UPC 2006.
8. Provide an accessible cleanout in each vent of a combination waste and vent system. Reference: Section 910.6, UPC 2006.
9. Coordinate the storm drainage design shown on sheets A2.01 and P-1.2 for the Produce Cooler/Maintenance/Mechanical room. Reference: Section 103.2.3, UPC 2006.
10. Coordinate the storm drainage and sewer designs shown on sheets P-1.2 and DR-1.1. Reference: Section 103.2.3, UPC 2006.
01/27/2009 ROBERT SHERRY WATER REVIEW Denied Tucson Water limits a 2" meter to a maximum demand of 80 GPM. Provide a letter from Tucson Water confirming that the use of a 2" water meter will be allowed for this project (114 GPM). Reference: Sections 610.2 and 610.12, UPC 2006
01/30/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide information to show that the operation of the Type I hoods and the hood exhaust fans comply with Section 507.2.1.1, IMC 2006.
2. Provide the installed weight of the Type I hoods for the rotisserie area. Reference: Sections 302.1 and 507.6, IMC 2006.
3. Clarify how two 12'-0" long Type I hoods are capable of providing for adequate overhang of the appliances considering the appliance layout dimensioned on floor plan 19/A5.01.3. Reference: Sections 507.13 and 507.15, IMC 2006.
4. Provide information to show that the proposed grease duct insulation system for the Type I hoods complies with ASTM E 2336. Reference: Section 506.3.10 (1), IMC 2006.
01/30/2009 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Costco - 6255 E. Grant Road
T08CM03574
Building Plan (1st Review)

TRANSMITTAL DATE: January 30, 2009

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. At the southwest corner of the proposed Receiving addition there is a pump room shown. This pump room is not shown on the approved development plan. If this pump room is to remain as part of this project a revised development plan is required.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped development plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t08cm03574.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents
02/02/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project: Costco-- Wholesale
6255 E Grant Rd
T08CM03574

Electrical plans for this project has been denied for the following items,please respond to them individually and how each has been addressed.

1. City of Tucson Commercial Submittal requires compliance with City of Tucson/Pima County Outdoor Lighting Ordinance #10135. Provide a calculation showing compliance . Ordinance can be obtained at City of Tucson web page ,going to Departments, Development Services,Codes and ordinances,Building Codes and down to Outdoor Lighting Ord.
2. Sheet E-1, provide information on new Fire Pump Controller/ATS.
3. Sheet E-1, provide amperage on exixting Fire Pump Breaker, also on new Fire Pump (100 HP).
4. Regarding "General Guideline For Power Switchover" since generator not installed with this plan should this be labed future ?
5.Provide information on generator, voltage,kw,overcurrent protection and main size. The reason for this is to size the ground conductor from the future generator tap box to the new generator breaker section. If the generator overcurrent device is 2000 amps as indicated, the ground should be 250mcm per 2005 NEC 250-122.
6. Sheet E-1 shows two panel named P-3, one of these should be P-5 ?
7. Sheet E-3, exterior lighting circuits H1- 43,45 not on panel schedule.
8. Sheet E-4, Bakery lighting shows circuits going to H6-35,41, where is Panel H-6 and it's schedule.Also Restroom lights 31,33,39.
9. Sheet E-4, where do the following circuits originate, E3_2/28, H5_2/16, H5_1/28, and H3_2/22.
10.Sheet E-5, cannot locate the followinf circuits on panel P7 on the power plan, 57,59,61, 71,73,75,79.
11. Sheet E-6, panels H1-1 and H1-2, the 84 circuit combo rated panel, each panel is rated at 225a cu bus. The feed to these panels is by a 400a feeder,these should be 400a rated.
12. The circuits in Panel H3-1 and H3-2, not located in power plan.
13. The circuits in Panel H5 not located in power plan.
14. The circuits in Panel P-3 not located in power plan.
15. The circuits in Panel P-5 not located in power plan.
16. The circuitry for the refrigerration equipment should be on the power plan sheets indicating conductor,conduit,and disconnect sizes as required.


Ray T Majuta
Electrical Plan Check
DSD City of Tucson
520-837-4988
2-06-09
02/06/2009 GERRY KOZIOL WWM REVIEW Denied COSTCO:EXPANSION/ REMODEL
NEED WASTEWATER/ IWC REVIEW OF GREASE INTERCEPTOR- TOM TOMCHAK- 443-6200 - 5025 W INA
NEED PLIMBING DEMO DRAWINGS SHOWING REMOVAL OF WASTEWATER PLUMBING FIXTURES FOR CREDIT EVALUATION, NEED PCRWRD 5TH FLOOR CREDIT EVALUATION 740-6602/740-6606

Final Status

Task End Date Reviewer's Name Type of Review Description
02/11/2009 THAUSER1 OUT TO CUSTOMER Completed
02/11/2009 SUE REEVES REJECT SHELF Completed