Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T08CM03512
Parcel: 10511061R

Review Status: Active

Review Details: COMMERCIAL TI

Permit Number - T08CM03512
Review Name: COMMERCIAL TI
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
10/31/2008 ANY WWM REVIEW Active
11/03/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
11/03/2008 DAVE MANN FIRE REVIEW Approved
11/03/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
11/04/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). (A 3/32" font may be allowed with an appeal to the building official.) Reference: Section 106.1.1, IBC 2006.
2. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC.
3. Revise the water isometrics and the waste and vent isometrics to clearly show the proposed work. Reference: Section 103.2.3, UPC 2006.
4. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006.
5. Given the temperature range of the water supply in Tucson (as high as 90.3 degrees Fahrenheit), specify how the temperature limit stop on the lavatory faucet is to be adjusted to guarantee a maximum delivery temperature of 110 degrees Fahrenheit. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
6. Provide an expansion tank or other approved device for controlling thermal expansion for the storage-type water heater. Reference: Section 608.3, UPC 2006.
7. Verify that the installation of the vacuum relief valve conforms to the manufacturer's listing and installation requirements (e.g. shut off valve locate between the relief valve and the water heater). Reference: Section 301.1.1, UPC 2006.
11/04/2008 ROBERT SHERRY WATER REVIEW Approved
11/04/2008 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied MIN SIZED LETTERING TO BE 1/8"
11/04/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). (A 3/32" font may be allowed with an appeal to the building official.) Reference: Section 106.1.1, IBC 2006.
11/04/2008 ERIC NEWCOMB ZONING HC SITE REVIEW Denied 1. NEED VERTICAL GRAB BAR
2. WATER FOUNTAIN NOT COMPLIANT, NEED HI/LOW OR SINGLE POINT OF USE
11/04/2008 ENEWCOM1 ADA REVIEW Passed NOT A COT PROJECT