Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM03403
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/17/2008 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
10/17/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant, i.e. sign and date all of the submitted sheets. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 3. Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions of the tenant space. Reference: Sections 106.1 and 106.3, IBC 2006 4. Provide mechanical energy code compliance calculations using the correct climate zone for Pima County < 4,000 feet 5. Show the size, routing, and termination of the condensate drains. Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or above grade in an area capable or absorbing the condensate flow without surface drainage. Reference: Section 307.2, IMC 2006 and Section 814.0, UPC 2006, as amended by the City of Tucson. 6. Provide calculations demonstrating adequate ventilation. Note that ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. Reference: Sections 401.2 and 403.3, IMC 2006. 7. Clarify if the massage room falls under the requirements of the City of Tucson ordinance relating to massage establishments. |
10/17/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
10/17/2008 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions with regard to the location and size of the existing water meter and backflow preventer. Reference: Sections 106.1 and 106.3, IBC 2006, and COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
10/17/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
10/17/2008 | CPIERCE1 | WWM | REVIEW | Needs Review | |
10/17/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant, i.e. sign and date all of the submitted sheets. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 3. Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions of the tenant space. Reference: Sections 106.1 and 106.3, IBC 2006. 4. Provide a complete plumbing plan, including the water and waste and vent isometrics. Reference: Section 103.2.3, UPC 2006. 5. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 6. Show that the location of the reduced pressure backflow preventer conforms to the access and clearance requirements of Section 603.3.4, UPC 2006. 7. Show how the new water and waste piping relates to the existing systems. Reference: Section 101.5.1, UPC 2006. 8. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006. 9. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves. Reference: Section 609.10, UPC 2006. 10. Provide a vent for each fixture trap (e.g. the floor drains). Reference: Sections 901.0 and 910.1, UPC 2006. |
10/17/2008 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
10/17/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
10/17/2008 | ENEWCOM1 | ADA | REVIEW | Passed | |
10/17/2008 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
10/17/2008 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Approved |