Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T08CM03258
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/26/2009 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Denied | 1. SEE BUILDING COMMENT. |
06/26/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. CHANGES TO DRAWINGS MUST BE PERMANENT AND FOLLOW THE SAME FORMAT USED FOR ALL OF THE DRAWINGS (NO HAND-WRITTEN NOTES). REVISE DRAWINGS AND RESUBMIT. |
07/01/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Coordinate the design of the water service piping to the new building as noted on sheet UT-1. The civil drawing shows a 1-1/4" water service but keynotes 1 and 2 call for a 1" service. 2. Comment not addressed. Clarify the size of the roof drain and overflow drain leaders. Sheet A6.1 calls out 8" pipes but detail 1/A6.2 shows 3" pipes. Reference: Section 103.2.3, UPC 2003. 3. Comment not addressed. Revise the roof drainage calculations (A6.1) using the roof data from this activity and the correct code edition. Reference: Section 1106.0, UPC 2006. 4. Comment not addressed. Revise the termination of the secondary (overflow) rainwater leader so that it terminates above grade in a location observable by the building occupants or maintenance personnel. Reference: Section 1101.11.2.2.1, UPC 2006. |
07/01/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed, submitted calculations are for Pima County >4,000 feet. Provide energy code compliance calculations (for Pima County < 4,000 feet). Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. Comment not addressed. If the building energy compliance is not in accordance with ASHRAE 90.1, the duct insulation shall be determined by Section 503.2.7, IECC 2006, as amended by the City of Tucson. Reference: Section 501.2, IECC 2006, as amended by the City of Tucson. |