Permit Number: T08CM03170
Parcel: 11105030F

Review Status: Completed

Review Details: COMMERCIAL-BLDG/FIRE/ZONING/ENG

Permit Number - T08CM03170
Review Name: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/18/2009 CPIERCE1 ENGINEERING REVIEW Needs Review
03/18/2009 TERRY STEVENS ZONING REVIEW Passed
09/23/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. The minimum insulation for ducts located in indirectly conditioned spaces within the building envelope is R-4.2 (installed). Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson.
2. The installation of the boiler shall be approved by the State Boiler Inspector.
09/23/2008 MARTIN BROWN FIRE REVIEW Approved
09/23/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. DETAILED SITE PLAN REQUIRED.
2. STRUCTURAL CALCULATIONS REQUIRED FOR ADEQUACY OF EXISTING STRUCTURE UNDER NEW HVAC LOADS.
3. NOTE TO PATCH WALL AT MECHANICAL UNIT: IS EXISTING WALL A ONE HOUR RATED WALL? IF SO, PATCH WALL PER EXISTING CONSTRUCTION. IF NOT, IS ENTIRE WALL REQUIRED TO BE MADE ONE HOUR? CLARIFY.
09/23/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
09/23/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
03/18/2009 CPIERCE1 OUT TO CUSTOMER Completed