Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/08/2008 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 2835 N Stone Avenue T08CM03160, T08CM03161, T08CM03162, T08CM03163, T08CM03164, T08CM03165, T08CM03166, T08CM03167, T08CM03168 Building Plan (2nd Review) TRANSMITTAL DATE: December 8, 2008 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t08cm03160.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
12/08/2008 | RBROWN1 | ADA | REVIEW | Passed | NOT A COT PROJECT |
12/08/2008 | MARTIN BROWN | FIRE | REVIEW | Denied | Please provide location(s) of new and/or existing fire hydrants, with dimensions to property lines. Refer to C.O.T. amendments to the 2006 IFC (section 508) for spacing requirements. Verify occupancy classification with building department. Fire department approved lock box will be required at access gate. Please include the following design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. Define where fire sprinklers will be installed, and how they will be supplied. Alley on west side of project does not appear to meet requirements for fire department access . |
12/08/2008 | GERRY KOZIOL | WWM | REVIEW | Denied | need 5th floor credit evaluation |
12/08/2008 | JASON GREEN | ENGINEERING | REVIEW | Needs Review | Building plan can not be approved prior to site plan approval. Review all comments associated with the site plan review, T08CM03039 per Paul Machado's comments dated October 8, 2008. JGreen |
12/10/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SEE COMMENTS FROM ACTIVITY #T08CM03160. |
12/11/2008 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
12/18/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | SEE REMARKS FOR T08CM03160 |
12/22/2008 | CPIERCE1 | WATER | REVIEW | Needs Review | |
12/22/2008 | CPIERCE1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
12/22/2008 | CPIERCE1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/05/2009 | THAUSER1 | OUT TO CUSTOMER | Completed |
01/05/2009 | THAUSER1 | REJECT SHELF | Completed |