Permit Number: T08CM02989
Parcel: 12510069A

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T08CM02989
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/11/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
09/11/2008 RONALD BROWN ZONING HC SITE REVIEW Approved
09/12/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/26/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide accessible showers per Section 608, ICC/ANSI A117.1-2003. Reference: Section 1109.2, IBC 2006.
2. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, recirculating pump and valves. Clarify how the hot water recirculation system will work as currently shown. Reference: Sections 103.2.3, 605.5, 608.3, and 608.7 UPC 2006.
3. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006.
4. The fixture connection sizes called out for the flush valves (water closets and urinals) will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Section A 6.1, UPC 2006 and IS 3-2003, Section 2.6.
10/02/2008 GERRY KOZIOL WWM REVIEW Denied 1. CONQUISTADOR EXECUTIVE OFFICES
2. BASEMENT & 1ST FLOOR - RECOUNTED ALL WASTEWATER PLUMBING FIXTURES - NEED 5TH FLOOR CREDIT EVALUATION
10/03/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project;T08CM02989
3773 E Broadway
TI Office

The Electrical plans have been denied for the following,

1.Sheet E-5, key note 5, the conductors run from the 400 A switch at the SES to the the wire way show 350 MCM conductors proceted at 400 A , should be 350 A per NEC 310-16. Please verify.
2. Sheet E-5, shows only one conduit run from wireway to disconnects B and C, will the same conduit also carry the load back to the wireway thur thru to the panel? If so a reduction in ampacity would be required,please verify.
3. Sheet E-5, the fault current for panels B and C are above 10 KAIC,please indicate on panels.


Ray T Majuta
DSD Electrical Plan Check
CIty of Tucson
250-837/4988
10/03/08
10/03/08