Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T08CM02938
Parcel: 11016223A

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM02938
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/02/2008 DAVE MANN FIRE REVIEW Approved
09/02/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/04/2008 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. 1/8" LETTERING IS REQUIRED ON ALL DRAWINGS UNLESS A WRITTEN APPEAL FOR 3/32" IS APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS. THIS APPROVED APPEAL MUST ACCOMPANY THE DRAWINGS SUBMITTED FOR CHECKING.
2. PROVIDE ALL APPROVED/SEALED SHELL DRAWINGS (THOSE PROVIDED ARE INCOMPLETE AND NOT SEALED).
3. SHEET A1.0; PROJECT DATA: INDICATE REQUIRED/PROVIDED PLUMBING FIXTURES PER 2006 IBC, CHAPTER 29.
4. PROVIDE DRINKING FOUNTAIN (HIGH/LOW OR POINT OF USE) PER 2006 IBC, CHAPTER 29.
5. PROVIDE 1/4" SCALE DRAWINGS AT RESTROOMS FOR CLARITY OF FIXTURE CLEARANCES AND ACCESSIBILITY.
6. SHEETS A5.1/A5.3: PROVIDE VERTICAL GRAB BARS, TOILET PAPER DISPENSER, AND ALL PERTINENT DIMENSIONS PER CHAPTER 6 OF ICC/ANSI A117.1-2003.
7. SHEET M2.0: PROVIDE STRUCTURAL CALCULATIONS FOR ANALYSIS OF EXISTING ROOF STRUCTURE WITH NEW HEAT PUMP LOADS.
09/08/2008 ERIC NEWCOMB ZONING HC SITE REVIEW Denied 1. SEE BUILDING COMMENTS.
09/15/2008 ROBERT SHERRY WATER REVIEW Approved
09/15/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide complete plumbing plans for the new work, including the layout of the new waste piping, water isometrics and complete waste and vent isometrics. Reference: Section 103.2.3, UPC 2006.
2. The shell water calculations are based on an allowable friction factor of 8.2 PSI per 100 feet. Provide justification for using a higher allowable friction factor. Reference: Sections 103.2.3 and 610.1, UPC 2006.
3. Show the water supply to the clothes washer box. Reference: Section 103.2.3, UPC 2006.
4. Clarify the design for the mounting shelf for the water heater with respect to the welds (¼" fillet for ¼" stock?), anchoring of the blocking, and the size of the fasteners. Provide structural calculations and to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006.
5. Clarify the purpose of the solenoid water valve and provide a manual control valve upstream of the solenoid valve. Note that the electrical power plan (E1.0) does not appear to include the location of the valve or its switch. Reference: Sections 103.2.3 and 605.7, UPC 2006.
6. Provide material standards for all plumbing fixtures being provided by others. Reference: Section 401.1, UPC 2006.
7. Provide water-use information for the model trimmer and include its demand with the water calculations. Reference: Section 610.1, UPC 2006.
8. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. (Note that the 2006 IECC has only 6 chapters.)
9. Provide the minimum plumbing facilities required by Table 2902.1 and Section 2902.2, IBC 2006 (i.e. a drinking fountain), for a business occupancy. Refer also to Section 1109.5, IBC 2006.
10. Provide a vacuum relief for water heater WH-1. Reference: Section 608.7, UPC 2006.
09/16/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). (A 3/32" font may be allowed with an appeal to the building official.) Reference: Section 106.1.1, IBC 2006.
2. Correct General Note 1 on sheet M2.0 to indicate that the City of Tucson is the Authority Having Jurisdiction.
3. Clarify the unit numbers for HP-3 and HP-4 on sheet M2.0. Reference: Section 106.3.1, IMC 2006.
4. Demonstrate energy code compliance for the mechanical systems using calculations based on the current code. Reference: Section 101.4, International Energy Conservation Code 2006. (Note that the 2006 IECC has only 6 chapters.)
5. Coordinate the Exhaust Fan Schedule (sheet M3.0) with the mechanical floor plan (M1.0). Reference: Section 106.3.1, IMC 2006.
6. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2, IMC 2006.
7. Show how the proposed sequence of operation for the restroom exhaust fans will prevent recirculation of the air from the restrooms when the restroom lights are turned off. Reference: Section 403.2.1, IMC 2006.
8. Show the termination point of the vacuum pump exhaust. Reference: Section 501.2., IMC 2006.
09/22/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project: TI Dental Office
5977 E Grant Rd 115
T08CM02938
Project has been denied for the following,

1. Revise font size used on drawings to min 1/8" all upper case.
2.Two suite #'s or possibly three if two or more meters are used, will be required on permit application in order to send clearances to utility.
3.Sheet E-4 code reference to transformer grounding electrode conductor made is NEC 250-26,b, the code reference should be 250-30 A,3.
4. Sheet E-4 does not show a panel C on one line diagram,however sheet E-3 shows panel C with circuits in it.
5.Panel B-3 circuit 34 is shown on panel to go to TMB, on Sheet E-1 it is used as a kitchen receptacle.
6.Sheet E-2 found circuits C-1,3,5,7, no panel C on service.
7.Sheet E-2 shows circuits for fixtures going to panel HA which is 277/480 volts and all fixtures on fixture schedule are shown as 120 volts.
8. Will require information on dental chairs in order to determine loads to circuits B-5,7,9,11.
9.Sign circuit not provided for.



Ray T Majuta
Electrical Plan Check
City of Tucson DSD
520-837/4988
9/23/08
09/25/2008 GERRY KOZIOL WWM REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
10/07/2008 VFLORES1 OUT TO CUSTOMER Completed
10/07/2008 SUE REEVES REJECT SHELF Completed