Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/02/2008 DAVE MANN FIRE REVIEW Denied The address on the plans does not match the address on the site application.
09/04/2008 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Fry's Fuel Center - 555 E. Grant Road
T08CM02919
Site Plan (1st Review)

TRANSMITTAL DATE: September 4, 2008

COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. This site plan was reviewed for compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC) for full code compliance for the fuel center only.

2. Provide a copy of the approved site/development plan drawings that includes the last approved parking calculation.

3. D.S.2-02.2.1.A.10 The sight visibility triangles (SVT's) shown on the plan are not shown correctly, see engineering comments. Also if applicable show future SVT's on the plan. Both Grant Road and 1st Avenue are arterial streets and there may also be intersection widening required, see engineering comments.

4. D.S.2-02.2.1.A.12 The location of the fuel truck appears to encroach into the twenty-four (24) foot wide two-way parking area access lane (PAAL). Per LUC Section 3.3.7.2 and D.S. 3-05.2.1.C.1, the minimum width of a two-way PAAL is twenty-four (24) feet.

5. D.S.2-02.2.1.A.12 The striped pedestrian circulation/accessible route, shown south of the proposed handicapped vehicle parking space, within the landscape area is required to be a sidewalk, see D.S. 2-08.4.1. Sidewalks within a project must be physically separated from any vehicular travel lane by means of curbing, grade separation, barriers, railings, or other means, except at crosswalks

6. D.S.2-02.2.1.A.12 Per D.S. 2-08.3.1 Within all development, a continuous pedestrian circulation/accessible route path is required. This path must connect all public access areas of the development and the pedestrian circulation path located in any adjacent streets. The areas within the development which must be connected include, but are not limited to, all buildings, all bicycle and vehicle parking areas, all recreation areas, all dumpster areas, and all other common use areas. This said, show the required pedestrian circulation/accessible route to Grant Road and to the existing shopping center.

7. D.S.2-02.2.1.A.13 If applicable, show the location, type, size and height of any existing and proposed free standing signs or billboards on site.

8. D.S.2-02.2.1.A.18 Label both Grant Road and 1st Avenue as MS&R.

9. D.S.2-02.2.1.A.19 Show the right-of-way (ROW) dimensions, future and existing, on sheet SP.

10. D.S.2-02.2.1.A.21 If applicable show future curb for both Grant Road and 1st Avenue and a dimension from the street monument line.

11. D.S.2-02.2.1.A.25 If applicable show the proposed site lighting layout on the plan.

12. D.S. 2-02.2.1.A.31 Show the proposed use as "GENERAL MERCHANCISE SALES "28", SUBJECT TO: SEC. 3.5.9.2.C."and GENERAL MERCHANDISE SALES "34", SUBJECT TO: SEC 3.5.9.2.A".

13. D.S. 2-02.2.1.A.32 Show the refuse container locations on the plan.

14. Per D.S. 2-02.2.2.B When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. This said all calculations required under D.S. 2-02.2.2.A are required for the entire site. Once the calculations are revised to include the entire site Zoning will be able to review the calculations.

15. Based on the SUBJECT TO: SEC. 3.5.9.2.C within a C-1 Zone the Fuel dispensing locations are limited to a maximum of twelve (12). This said it appears that there are fourteen dispensing locations proposed within the C-1 zone.

16. Additional comments may be forth coming depending on how each comment has been addressed.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

C:\planning\site\t08cm02919.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents.
09/05/2008 RONALD BROWN ZONING HC SITE REVIEW Denied 5 SEPT 2008
T08CM02919/FRYS FUEL CENTER
REVIEWED BY RON BROWN
ACCESSIBLE REVIEW
2006 IBC/ICC 117.1

DENIED: SEE COMMENTS BELOW

I SHEET 1 OF 77
A. Provide an extended Accessible Route from the New Fuel Depot to the existing Building as per IBC 2006, Section 1104.
II. SHEET 5 OF 77
A. At notes 14, 15, and 16, change the "ADA" reference to 2006 IBC/ICC 117.1.
III SHEET 10 OF 77
A. Provide an extended Accessible Route from the New Fuel Depot to the existing Building as per IBC 2006, Section 1104.
IV SHEET 1 OF 77
A. Provide an extended Accessible Route from the New Fuel Depot to the existing Building as per IBC 2006, Section 1104.
B. Provide a surface mounted curb along the Accessible Route portion from the accessible parking aisle to the 90 degree turn to the marked crossing to the cashier kiosk. Reference zoning development standards.
C. Provide detectable warnings at both ends of the marked crossing to the cashier kiosk as per ICC/ANSI 117.1, Sections 406.12 and 406.14.
D. Redesign the marked crossing from First Av to be perpendicular with the parking side. Cars backing up will back up into the angled marked crossing as detailed.
E. Please correct ramp reference 09/SP4 to read 03/SP5
F. Please provide specific large scale details of all other curb and side walk ramps complying with 2006 IBC/ICC 117.2 Sections 405 and 406. Please provide specific designed details and not generic details showing all dimensions, slopes and detectable warnings as required.

END OF REVIEW
09/10/2008 PETER MCLAUGHLIN LANDSCAPE REVIEW Denied 1. Provide a copy of the approved site or development plans, including last approved landscape plans.

2. Obtain approval for right-of-way improvements, including landscaping and irrigation, from the Departrment of Transportation in compliance with the TDOT standard (see comment 3). Provide verification, in writing, of any approvals obtained. Contact Gary Wittwer, DOT Landscape Architect for specific requirements.

3. Revise the landscape plans to include the following standard notes for landscaping in the public right-of-way:

All planting and irrigation that is proposed within the ROW must receive a permit prior to construction. Plans should be submitted to the City of Tucson Permits and Code section at 201 N. Stone, 4th floor. Once the permit has been approved, the applicant must call for a "Blue Stake " prior to the required pre-construction meeting with the City Landscape Architect, and prior to starting any work.

It is the property owner's responsibility to keep the Sight Visibility Triangles (SVT), and the pedestrian access area clear of vegetation at all times, per Land Use Code (LUC) section 3.7.2.9.

Final plant locations must be in compliance with all utility setback requirements. The owner understands that if the City of Tucson Transportation Department or any utility company needs to work within the ROW in the landscaped area, plants and irrigation may be destroyed without replacement or repair.

The property owner assumes full liability for this landscape and irrigation, and any damage to roadway, sidewalk and utilities within the public right-of-way.

The only private irrigation equipment that is allowed within the ROW is polyethylene type tubing and emitters that are not under constant pressure. All other equipment except for the water meter must be on site.Standard Notes for Planting in ROW
09/10/2008 PETER MCLAUGHLIN NPPO REVIEW Passed
09/25/2008 PAUL MACHADO ENGINEERING REVIEW Denied To: KDRA DATE: September 24, 2008
7400 E. McDonald Road
Scottsdale, Arizona, 85250

SUBJECT: Fry's Fuel Center, 695 E. Grant Road
Site plan T08CM02919 (First Review)
T13S, R13E, Section 36

RESUBMITTAL REQUIRED: Site Plan and Drainage Statement.

The Site Plan (SP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Site Plan:

1. Please include a response letter to the comments along with the corrected copies of the SP.
2. Label existing and future sight visibility triangles per D.S. 2-02.2.1.10.
3. Show all points of egress and ingress including locations and width of driveways and parking area access lanes (P.A.A.L.) per D.S. 2-02.2.1.11.
4. Please label all vehicular, bicycle, pedestrian, and handicapped circulation clearly identified per D.S. 2-02.2.1.12.
5. Fully dimensioned loading space(s) and maneuvering area(s) per D.S. 2-02.2.1.14. Traffic exiting onto First Avenue cannot turn into existing oncoming traffic. Perhaps a larger curb radius would work.
6. Please list estimated cut & fill quantities per D.S. 2-02.2.1.17.
7. Please show dimensioned right-of-way, including any applicable Major Streets and Routes (MS&R) Plan right-of-way per D.S. 2-02.2.1.19. Intersection widening will be required for both Grant Road and First Avenue. See City of Tucson Major Streets and Routes (MS&R) Plan right-of-way at: http://www.tucsonaz.gov/planning/plans/all/msr.pdf.
8. Sidewalks, curbs and wheelchair ramps are required where applicable per D.S. 3-01.3.0 and installed with "Detectable Warnings" per ADAAG.
9. Dimension from street monument lines to existing and proposed curbs, sidewalks, driveways, and utility lines per D.S. 2-02.2.1.21.
10. Please provide existing topographic contours at intervals not exceeding two (2) feet and/or spot elevations as pertinent and Bench Mark based on City of Tucson Datum, including City Field Book and page number per D.S. 2-02.2.1.23.
11. Show all fences, walls, or vegetation for screening and sight visibility by type, material, height, location and spacing per D.S. 2-02.2.1.27.
12. Show Site plan number (T08CM02919) on all sheets per D.S. 2-02.2.1.29.
13. Show refuse container location, size, and access thereto fully dimensioned per D.S. 2-02.2.1.32 and D.S. 6-01.0 or obtain documentation from City of Tucson Environmental Services omitting the need for a refuse container.
14. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
15. Please show a typical cross section of the P.A.A.L. or call out the percentage of slopes. Call out the GB at the D/W, if applicable.
16. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks including any other site drainage as well. Please provide supporting calculations to demonstrate compliance with D.S. 3-01.4.4. If the location(s) of the roof scuppers have not yet been decided, a general note indicating sidewalk scuppers will be used when the roof scuppers locations have been designed and located will suffice.
17. Add note: "Depress all landscaped areas 6" maximum for water harvesting".

Drainage Statement:
The Drainage Statement has been accepted by engineering.

If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax
C:/695 E. Grant Rd site

Final Status

Task End Date Reviewer's Name Type of Review Description
10/08/2008 DELMA ROBEY OUT TO CUSTOMER Completed
10/08/2008 SUE REEVES REJECT SHELF Completed