Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T08CM02858
Parcel: 12419037A

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM02858
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/25/2008 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Clean Energy
T08CM02858
Canopy Plan (1st Review)

TRANSMITTAL DATE: August 25, 2008

1. The canopy plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t08cm02858.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents
08/25/2008 DAVE MANN FIRE REVIEW Approved
08/25/2008 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
08/25/2008 RBROWN1 ADA REVIEW Passed Not a COT project
08/25/2008 RONALD BROWN ZONING HC SITE REVIEW Passed Structural canopy only
08/27/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/02/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied If an overflow is not to be installed, provide structural calculations to show that the roof can support the weight of water that will accumulate if the primary roof drain is blocked. Reference: Section 1101.11.2, UPC 2006 and Section 1611.1, IBC 2006.
09/02/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
09/12/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Passed
09/15/2008 JASON GREEN ENGINEERING REVIEW Denied Canopy Building Plan can not be approved prior to site plan approval. The site plan has been conditionally approved at this time, however comments are still outstanding. Once all comments from the site plan have been addressed and the site plan has been stamped approved the canopy building plan will also be stamped approved. JG

Final Status

Task End Date Reviewer's Name Type of Review Description
09/25/2008 DELMA ROBEY OUT TO CUSTOMER Completed
09/25/2008 SUE REEVES REJECT SHELF Completed