Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM02840
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/22/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. 1/8" LETTERING ON ALL DRAWINGS REQUIRED UNLESS A WRITTEN APPEAL IS APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS. THIS APPROVED APPEAL MUST ACCOMPANY DRAWINGS SUBMITTED FOR CHECKING. 2. SHEET T.1; CODE REVIEW: COMPLETE #10 (PLUMBING FIXTURES REQUIRED) INCLUDING WATER CLOSETS, LAVATORIES, DRINKING FOUNTAINS, AND SERVICE SINKS. REVISE PLANS AS REQUIRED. 3. ENLARGE BATHROOM PLANS TO 1/4" SCALE. INCLUDE CRITICAL DIMENSIONS PER ICC/ANSI A117.1-2003, CHAPTER 6. 4. IS PERMIT FOR CERTICATE OF OCCUPANCY, OR LETTER OF COMPLETION ONLY? VERIFY. |
| 08/22/2008 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 08/22/2008 | RBROWN1 | ADA | REVIEW | Passed | NOT A COT PROJECT |
| 08/22/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 08/25/2008 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Denied | 1. SEE BUILDING COMMENTS |
| 09/03/2008 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Provide the site utility plan showing the location of the reduced pressure backflow assembly on the drawings, specify the reduced pressure backflow assembly being installed, and indicate the size of the assembly. Reference: COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf 2. Provide the size of the existing water meter and total demand placed on that meter. Reference: Section 103.2.3, UPC 2006. |
| 09/03/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 2. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2006, for mercantile occupancy. |
| 09/03/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 2. Revise the termination of the condensate drain so that the location of the direct connection to a tailpiece is in the same area controlled by the person controlling the air-conditioned space. Reference: Section 807.2, UPC 2006. 3. Provide structural calculations and framing details to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top unit. Reference: Section 302.1, IMC 2006. 4. Show how adequate access is being provided for the equipment located on the roof. Reference: Section 306.5, IMC 2006. 5. Correct the arithmetic in the ventilation calculations |
| 09/12/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | PROJECT; 3650 N 1ST T08CM02840 #100 T08CM02840 #110 T08CM02849 #120 T08CM02850 #130 These projects have been denied for the following, 1.The electrical sheets are required to all be signed by the electrical engineer and dated. 2. Provide fault current calculations starting at the service on to the panels. 3. Conductor feeds to the new 1000 amp CT can do not show the grounded conductor. 4. Service disconnects showing units 100,124,126,128, are incorrect, show 100,110,120,130, as labeled on permit. 5. Conductors going to main service disconnects do not show grounded conductors. 6. Label panels according to suite numbers not letters. 7. Provide rooftop service receptacles for Hvac equipment. 8. Describr fixture C type and show to which panel and circuit it will be going to. Ray T Majuta DSD City of Tucson, Plan Check. 9/15/08 |
| 09/18/2008 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/28/2008 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 10/28/2008 | SUE REEVES | REJECT SHELF | Completed |