Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM02806
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/19/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
08/20/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
08/20/2008 | RONALD BROWN | ZONING HC SITE | REVIEW | Denied | 1. Provide a cost valuation breakdown showning actual TI costs and costs related to accessiblility not to exceed 20% of the overall TI costs. 2006 IBC, Section 3409.7.1. 2. Men's and Women's Room Nos. 16 and 18 do not meet 2006 IBC/ICC 117.1 accessible standards. Reference section 604.3.2, fixtures may not overlab toilet clear space. If these two toilets do not meet ICC 117.1 standdards, Accessible toilet signs may not be posted. 3. Please provide a larger scale plan of all toilets and provide proper dimensions showing compliance with 2006 IBC/ICC 117.1 accessible standards. 4. Detail 6 is also not in compliance with same reference section 604.3.2 |
08/21/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
09/02/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12. (See text at: http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). In addition, accessible metering faucets shall remain open for a minimum of 10 seconds. Reference: Section 402.1, UPC 2006, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-2003. 2. The specified drinking fountain does not meet the accessibility requirements as shown in Section 1109.5, IBC 2006. 3. Based on the proposed design, revise the description of the thermostatic mixing valve to indicate conformance with ASSE 1017 (source application), not ASSE 1016 (point-of use-application). 4. Show size, route and termination of the T&P relief piping for the water heater. Reference: Section 608.5, UPC 2006. 5. Include all fixtures served by the existing water meter when calculating the total demand and determining pipe sizes. Reference: Section 610.1, UPC 2006. 6. Verify the pressure drop of the RPBP used in the water calculations. Reference: Section 610.2, UPC 2006. 7. Coordinate the equipment names with the mechanical drawings (e.g. AC-1 on the mechanical drawings is AC-4 on the plumbing drawings. |
09/02/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
09/02/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Verify the room areas and the arithmetic used in the ventilation calculations. Reference: Section 403.3, IMC 2006. 2. Coordinate the equipment names with the plumbing drawings (e.g. AC-1 on the mechanical drawings is AC-4 on the plumbing drawings. |
09/08/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
09/11/2008 | GERRY KOZIOL | WWM | REVIEW | Denied | NEEDS 5TH FLOOR CREDIT EVALUATION |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/19/2008 | CPIERCE1 | OUT TO CUSTOMER | Completed |
09/19/2008 | SUE REEVES | REJECT SHELF | Completed |