Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T08CM02804
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/20/2008 | DAVE MANN | FIRE | REVIEW | Denied | Please include the following design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D(for each part)) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. |
| 08/20/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 08/20/2008 | RONALD BROWN | ZONING HC SITE | REVIEW | Approved | |
| 08/25/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. 2. Provide water supply isometrics. Reference: Section 103.2.3, UPC 2006. 3. Provide material standards for all plumbing fixtures being selected by the owner. Reference: Section 401.1, UPC 2006. 4. Provide a detail showing how the specified direct vent, instantaneous water heater is to be installed, including the flue size, flue height, and flue termination. Reference: Sections 103.2.3, 605.5, 608.3, and 608.7 UPC 2006. Reference: Sections 103.2.3 and 510.3.4, UPC 2006. 5. Clarify what is intended by "Future T.I." in the fixture unit calculations for the apartment. 6. Provide CW shut off valves for each building entrance. Reference: Section 605.2, UPC 2006. 7. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. clothes washer). Reference: Section 609.10, UPC 2006. 8. Provide water pressure and water pipe sizing calculations. Reference: Section 610.1, UPC 2006. 9. Calculate the water demand using the fixture units shown in Tables 6-5 or A-2. Reference: Section 610.3, UPC 2006. 10. Coordinate the water service piping for the irrigation system, for both size and layout, with the plumbing drawings. 11. Specify the materials to be used for the drainage piping and fittings (i.e. what is ABS 50-40?). Reference: Section 701.0, UPC 2006. 12. Provide a schedule of waste fixture units for all plumbing fixtures using the values shown in table 7-3, UPC 2006. Include the total number of each fixture being installed. Reference: Section 703.1, UPC 2006. 13. Resize the drainage piping to conform to Table 7-5, UPC 2006 (see bath #1); any fitting or connection in a drainage system that results in a reduction of the pipe area is prohibited. Reference: Sections 316.4.1 and 703.2, UPC 2006 14. Provide the rim elevation of the next upstream sanitary manhole (it is not shown on the site plan) and the first floor elevation. Determine the need for a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson. 15. Revise the design of the indirect waste receptor for the clothes washer to comply with the requirements of Section 804.1, UPC 2006. 16. Size natural gas pipe per Section 1217.1, UPC 2006 or provide calculations demonstrating conformance to Section 1217.3, UPC 2006. 17. Coordinate the developed pipe lengths shown in the gas line size calculations with the pipe layout shown on the plumbing floor plan. |
| 08/26/2008 | ROBERT SHERRY | WATER | REVIEW | Denied | Clarify the water service to the building; the site drawing indicates two separate water service lines (as do the plumbing drawings) but shows a single water meter. In addition, the 2" water service is called out as a fire sprinkler riser. If the apartment and the first floor are sharing a water service, a reduced pressure backflow preventer will be required for the water service. Reference: Section 103.2.3, UPC 2006 and COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
| 08/27/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy code compliance calculations for a new commercial building. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation Reference: Section 101.4, International Energy Conservation Code 2006. 2. The 2006 International Mechanical Code with Local Amendments is the relevant code for this project. 3. Provide manufacturer's equipment data along with mechanical and electrical operating information for the new exhaust fans. Reference: Section 301.6, IMC 2006. 4. Show that HP-1 and FC-1 are being installed in accordance with the conditions of their listings and the manufacturer's installation requirements. Reference: Section 304.1, IMC 2006. 5. Show how the fan coils are being connected to the building structure and provide calculations to show that the building structure is not being adversely affected. Reference: Section 302.1, IMC 2006. 6. Provide maintenance access space for the equipment (FC-1) in accordance with the manufacturer's installation instructions. Reference: Section 304.1, IMC 2006. 7. Provide auxiliary drain pans or secondary drain systems for fan coil units. Reference: Section 307.2.3 IMC 2006. 8. Show the size, routing, and termination of the condensate drain. Reference: Section 307.2, IMC 2006 and Section 814.0, UPC 2006. 9. Provide the ductwork sizes. Reference: Section 603.2, IMC 2006. |
| 08/27/2008 | TERRY STEVENS | ZONING | REVIEW | Denied | 08/27/2008 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |
| 09/04/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 09/10/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 09/10/2008 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/11/2008 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 09/11/2008 | SUE REEVES | REJECT SHELF | Completed |