Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM02704
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/06/2008 | DAVID RIVERA | ZONING | REVIEW | Approved | |
| 08/06/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Comments: 1. Show how fan coil 10 is to be supported. 2. Provide secondary condensate drainage. 3. Revise the size of the condensate piping to comply with the sizing requirements of Section 307.2.2, IMC 2006, as amended by the City of Tucson. |
| 08/06/2008 | RBROWN1 | ADA | REVIEW | Passed | |
| 08/06/2008 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 08/06/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 08/06/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide the pipe sizes, loads, and developed lengths for the gas piping. |
| 08/06/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
| 08/06/2008 | RONALD BROWN | ZONING HC SITE | REVIEW | Approved | |
| 08/07/2008 | CPIERCE1 | WWM | REVIEW | Needs Review | |
| 08/07/2008 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 08/07/2008 | CPIERCE1 | WATER | REVIEW | Needs Review | |
| 08/07/2008 | CPIERCE1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |