Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM02690
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/05/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
08/11/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A100; DEMOLITION/FLOOR PLAN: ARE NOTES 12, 16, AND 17 TO BE OMITTED? NOT LOCATED ON PLANS. 2. SHEET A100; DEMOLITION/CEILING PLAN: IS NOTE 15 TO BE OMITTED? NOT LOCATED ON PLANS. |
08/13/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
08/19/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 2. Provide a cleanout for the foot vent. Reference: Section 909.0, UPC 2006. 3. Provide a cleanout for the new hand sink and for the two new floor sinks. Reference: Section 707.4, UPC 2006. 4. Show how the new drainage piping relates to the existing drainage piping in the building. The instruction to "connect to nearest existing sanitary piping of equal or greater size", is not adequate to ensure compliance with the drainage pipe sizing shown in Table 7-5, UPC 2006. |
08/19/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/19/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Clarify the reference to a "water-cooled condenser" and to the cooling coils in the beverage system Distribution schematic. If they exist, show that the systems comply with Section 1201.3, IMC 2006, as amended by the City of Tucson. |
08/22/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project; T08CM02690 1001 E Benson Hwy TI Remodel This plan has been denied for the following: 1. Provide the location for the new panel C on the electrical drawing , this location to be noted on plan even if EC and McDonald rep have to verify. 2. Provide the total load calculation for the MDP with new panel C included for verification of total load. Ray T Majuta Elect Plan Check DSD<Tucson 520-837/4988 8/21/08 |