Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T08CM02688
Parcel: 105102520

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T08CM02688
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/04/2008 LOREN MAKUS ENGINEERING REVIEW Approved
08/05/2008 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A-5: PROVIDE STRUCTURAL CALCULATIONS FOR ADDITION OF NEW ROOF TOP UNITS TO EXISTING ROOF.
2. SHEET A-5: PROVIDE CONNECTION DETAILS OF THE NEW ROOF TOP UNITS TO EXISTING ROOF STRUCTURE.
3. PROVIDE APPROVED SHELL DRAWINGS.
08/05/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed Impact Fee's Do Apply; Central District; 2,287 Square Feet of Restaurant; $7,231.18
08/07/2008 DAVE MANN FIRE REVIEW Approved
08/12/2008 GERRY KOZIOL WWM REVIEW Approved
08/15/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). (A 3/32" font may be allowed with an appeal to the building official.) Reference: Section 106.1.1, IBC 2006.
2. Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions of the tenant space and any shared plumbing systems. Reference: Sections 106.1 and 106.3, IBC 2006.
3. Coordinate the plumbing and architectural floor plans (i.e. agree on which room is the men's restroom and which is the women's restroom). Reference: Section 103.2.3, UPC 2006.
4. Complete the waste and vent isometrics (e.g. include the grease interceptor, show all of the pipe sizes, and show the waste piping for all fixtures). Reference: Section 103.2.3, UPC 2006.
5. Provide specifications for the urinal. Reference: Section 103.2.3, UPC 2006.
6. Provide equipment data for the water heater. Reference: Section 103.2.3, UPC 2006.
7. Provide water supply isometrics. Reference: Section 103.2.3, UPC 2006.
8. Provide an automatic fuel shutoff valve for the gas-fired appliances located under the type I hood. Reference: Section 904.3.3, IFC 2006.
08/15/2008 ROBERT SHERRY WATER REVIEW Approved
08/18/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project# T08CM02688
4210 N 1st AV
Dickey's Barbeque Pit

This plan has been denied for the following items:
1. Provide an energy conservation calculation for the lighting as per thr 2006 IECC.
2. Lighting plan sheet E-2, show lighting circuits going to individual lights rather than just showing just 2 cicuits feeding all lights connected.



Ray T Majuta
Electrical Plan Check
DSD City of Tucson
520-837/4988
8/19/08
08/18/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). (A 3/32" font may be allowed with an appeal to the building official.) Reference: Section 106.1.1, IBC 2006.
2. Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions of the tenant space and any shared plumbing systems. Reference: Sections 106.1 and 106.3, IBC 2006.
3. Provide updated energy code compliance calculations (mechanical and lighting). Provide the envelope energy calculations if they were not submitted with the shell package. Reference: Section 101.4, International Energy Conservation Code 2006.
4. Provide information to show how the condensate drain system for RTU-1 and RTU-2 has been sized. Reference: Section 307.2.2, IMC 2006, as amended by the City of Tucson.
5. Control of the restroom exhaust fans by occupancy sensors will result in the complete recirculation of the supply air from the restrooms when they are unoccupied. Complete recirculation of the supply air from the restrooms is prohibited. Reference: Section 403.2.1 (3), IMC 2006.
6. Ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. The outside air calculations shown on sheet M-3 appear to be based on only one water closet for each restroom; the restrooms each have two fixtures, not one. Reference: Table 403.3, IMC 2006.
7. Revise the size of the grease duct to provide a minimum velocity of 1500 feet per minute. Reference: Section 506.3.4, IMC 2006, as amended by the City of Tucson.
8. Provide structural calculations and details to show that the Type I and Type II hoods are supported from the building structure in accordance with Section 507.6, IMC 2006. Reference: Section 302.1, IMC 2006.
9. Provide information to show how the Type I and Type II hoods are to be interconnected to the kitchen equipment as noted in the exhaust fan schedule on sheet M-3. Reference: Sections 106.3.1 and 507.2.1.1, IMC 2006.
10. Clarify the surface treatment of the wall behind the Type I hood. Reference: Sections 106.3.1 and 507.9, IMC 2006.
11. Provide information to show that the make up air for the kitchen hood complies with Section 508.1.1, IMC 2006.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/27/2008 CINDY AGUILAR OUT TO CUSTOMER Completed