Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM02603
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/29/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/31/2008 | MARTIN BROWN | FIRE | REVIEW | Approved | |
07/31/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. 1/8" LETTERING IS REQUIRED ON ALL DRAWINGS UNLESS A WRITTEN APPEAL IS APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS. THIS APPROVED APPEAL MUST ACCOMPANY DRAWINGS SUBMITTED FOR PLAN REVIEW. 2. SHEET G1.02; PHASE PLANS: CORRECT DOUBLE ROOM REFERENCES ON ALL PLANS. 3. SHEET S1; OPTICAL CEILING FRAMING PLAN; SECTIONS C AND D/2.1A, AND DETAIL A-2.1: CLARIFY WHERE THESE SECTIONS/DETAILS OCCUR. 4. SHEET S1; DETAIL "b-b"; NOTE REFERENCE TO HOLDOWN SCHEDULE: WHICH HOLDOWN IS TO BE USED AT WHAT LOCATION? WALL BRACING SCHEDULE DOES NOT INDICATE ANY HOLDOWN. CLARIFY. 5. SHEET S1; TYPICAL TOP SPLICE DETAIL AT BUILDING COLUMNS: VERIFY WHERE THIS DETAIL OCCURS. 6. SUBMIT TWO SETS OF SIGNED/STAMPED STRUCTURAL CALCULATIONS. |
07/31/2008 | TERRY STEVENS | ZONING | REVIEW | Approved | |
08/08/2008 | GERRY KOZIOL | WWM | REVIEW | Denied | NEEDS TO IDENTIFY ALL WASTEWATER PLUMBING FIXTURES REMOVED FOR CREDIT. NEEDS WATEWATER 5TH FLOOR CREDIT EVALUATION |
08/14/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC. 2. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 3. Provide a complete plumbing plan, including water and waste & vent isometrics. Reference: Section 103.2.3, UPC 2006. 4. Clarify the location of the water heater: is it located above the ceiling (Detail 17/M-2) or under the south sink (sheet M-1 plumbing plan)? Reference Sections 103.2.3 and 509.4, UPC 2006 5. All storage-type water heaters installed in a closed system require a listed expansion tank. Please show expansion tanks on the plans. Reference: Section 608.3, UPC 2006 with local amendments. 6. Connect vacuum relief valve to the water heater piping per the manufacturer's recommendations. Reference: Section 501.0, UPC 2006. 7. Clarify the route and termination of the T&P relief piping. Reference: Section 608.5, UPC 2006. |
08/14/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/14/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The 2006 International Mechanical Code with Local Amendments is the relevant code for this project. 2. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 3. Provide calculations demonstrating adequate ventilation. Reference: Sections 401.2, 403.3, and 403.3.2, IMC 2006. |
08/15/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |