Permit Number: T08CM02434
Parcel: 107020130

Review Status: Completed

Review Details: RESUBMITTAL - SITE ALL

Permit Number - T08CM02434
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/29/2008 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Copper/State Bolt & Nut Co.
T08CM02434
Site Plan (2nd Review)

TRANSMITTAL DATE: August 29, 2008

COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. This site plan was reviewed for compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC) for full code compliance.

2. The lot line realignment must be approved prior to approval of the site plan. It appears that there is some type of lot line re-alignment or lot split proposed for this project. The lot line re-alignment/lot split must be approved by the City of Tucson prior to approval of this site plan.

3. It appears that that the "A" Parking Angle, and "E" Curb Length dimension are not correct, see redline for correct dimensions. D.S.2-02.2.1.A.5 As there is additional angled parking proposed provide a detail for the angled parking. Ensure to include the "A" Parking Angle, "B" Space Width, "C" Space Depth and "E" Curb Length dimension on the detail.

4. Zoning acknowledges that the required easement will be recorded and the recordation information will be put on the site plan prior to approval. D.S. 2-02.2.1.A.20 A twenty-four (24) foot ingress/egress easement will be required for the twenty-four (24) PAAL along the northwest property line. Show the easement along with the recordation information on the plan.

5. The existing use should be called out as vacant. D.S. 2-02.2.1.A.31 Show the existing use on the plan

6. Additional comments may be forth coming depending on how each comment has been addressed.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

C:\planning\site\t08cm02434-2nd.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents.
09/02/2008 DAVE MANN FIRE REVIEW Approved
09/03/2008 RONALD BROWN ZONING HC SITE REVIEW Approved
09/12/2008 JOE LINVILLE LANDSCAPE REVIEW Approved
09/19/2008 BIANCA RAMIREZ ENGINEERING REVIEW Denied DATE: August 22, 2008
SUBJECT: Site Plan
TO: MPE
LOCATION: 3162 N Freeway Industrial, T13S, R13E, Section 34, Ward 1
REVIEWERS: Bianca Ramirez, CFM
ACTIVITY: T08CM02434 (First Review)


RESUBMITTAL REQUIRED: Site Plan

SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed site plan for the above referenced property. Engineering Division does not recommend approval of the site plan at this time. Please address the following review comments prior to the next submittal.

Please include a response letter to the comments along with the corrected copies of the site plan.

Site Plan:

1. The lot line realignment must be approved prior to approval of the site plan. It appears that there is some type of lot line re-alignment or lot split proposed for this project. The lot line re-alignment/lot split must be approved by the City of Tucson prior to approval of this site plan.
2. Complied
3. Complied
4. Complied
5. Complied.
6. Verify that all points of egress and ingress are identified on site plan. Include all locations, width of driveways and parking area access lanes (P.A.A.L.) per D.S. 2-02.2.1.11. Unable to locate keynote #32 on site plan.
7. Fully dimension maneuvering area(s) per D.S. 2-02.2.1.14. Provide (label and dimension) the required onsite maneuvering area for the loading zone that is shown adjacent to the proposed building. Refer to AASHTO for the national standards for turning radii. The maneuverable area has to be provided onsite for the loading zone. If onsite maneuverability can not be achieved then a variance must be submitted and approved for offsite maneuvering within the public right of way. If a variance is applied for then the site plan cannot be approved until such variance is approved. Provide radaii dimensions on site plan.
8. Complied
9. Complied
10. DS Sec.2.02.2.1.A.16: Provide drainage arrows for roof drainage. Any scuppers proposed under the sidewalk will be designed and constructed to convey the 10-year flood flow. Provide a drainage statement showing scupper calculations that demonstrate that the 10-year flood flow is contained under the sidewalk.
11. Complied
12. Complied
13. Complied
14. Zoning acknowledges that the required easement will be recorded and the recordation information will be put on the site plan prior to approval. D.S. 2-02.2.1.A.20 A twenty-four (24) foot ingress/egress easement will be required for the twenty-four (24) PAAL along the northwest property line. Show the easement along with the recordation information on the plan.
15. Call out dimensions from street monument lines to existing and proposed curbs, sidewalks, driveways, and utility lines per D.S. 2-02.2.1.21.
16. Provide contour interval on plan.
17. Complied
18. Complied
19. Complied
20. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
21. Complied
22. List the drainage engineer on the plans with the pertinent information.
23. Complied
24. Complied
25. Complied
26. Complied
27. Complied
28. Call out curb return radaii on site plan.
28. Additional comments may be forthcoming.

Drainage Report:

1 - 3: Complied

If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov

Bianca C. Ramirez
Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4928 office
(520) 879-8010 fax
09/23/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the site drawing to include the location, invert, and rim elevation of the upstream and downstream manholes along with the location of the building's connection to the public sewer. Reference: City of Tucson Development Standard No. 2-05.0 2.3 and Section 103.2.3, UPC 2006.
2. Where the finish floor elevation is less than 12 inches above the elevation of the next upstream manhole in the public sewer or private sewer collection system, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor. Floors discharging from above that reference point shall not discharge through the backwater valve. Reference: Section 710.1, UPC 2006, as amended by the City of Tucson.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/24/2008 CINDY AGUILAR OUT TO CUSTOMER Completed
09/24/2008 SUE REEVES REJECT SHELF Completed