Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T08CM02307
Parcel: 10511061R

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM02307
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/30/2008 TERRY STEVENS ZONING REVIEW Approved
06/30/2008 GERRY KOZIOL WWM REVIEW Approved
06/30/2008 BIANCA RAMIREZ ENGINEERING REVIEW Approved
07/01/2008 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T08CM02307 7/1/08

1. For the VAV units on Sheet E-2, provide for size of the fusing at the disconnecting means.
2. For the VAV unit on Keynote 24 Sheet E-2, provide for the feeder conductor size.
3. For the VAV unit on Keynote 25 Sheet E-2, #10 conductor for the feeder is not protected by a 60A breaker.
4. Circuit RA-24 has 7 receptacles per the Power Plan, but on the panel schedule it has controls/detectors.
5. Unit equipment for emergency illumination appears to violate NEC 700.12 (E).
6. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006.
7. Could not read all luminaire designations. REVIEW INCOMPLETE AND WILL RESUME AFTER LEGIBILITY AND FONT SIZE ISSUES RESOLVED.
07/01/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Thermostats shall be located no higher than 48" above the finished floor. Reference: Section 308.2.2, ICC/ANSI A117.1-2003.
07/01/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. MIN SIZE LETTERING 1/8"
2. CAN NOT ACCESS TOILET THROUGH STORAGE ROOM
3. PROVIDE CORRIDOR CODE ANALYSIS FOR FIRE RATING REQUIREMENT AND NOTE ON DRAWINGS
4. PROVIDE ALL NEW PARTITION TYPES REFERENCES
07/01/2008 ROBERT SHERRY WATER REVIEW Approved
07/01/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks require cleanouts regardless of length). Reference: Section 707.4, UPC 2006.
2. Show how the temperature of the hot water supply to the public lavatory is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
07/02/2008 MARTIN BROWN FIRE REVIEW Approved
07/23/2008 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review