Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM02307
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/30/2008 | TERRY STEVENS | ZONING | REVIEW | Approved | |
06/30/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
06/30/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
07/01/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T08CM02307 7/1/08 1. For the VAV units on Sheet E-2, provide for size of the fusing at the disconnecting means. 2. For the VAV unit on Keynote 24 Sheet E-2, provide for the feeder conductor size. 3. For the VAV unit on Keynote 25 Sheet E-2, #10 conductor for the feeder is not protected by a 60A breaker. 4. Circuit RA-24 has 7 receptacles per the Power Plan, but on the panel schedule it has controls/detectors. 5. Unit equipment for emergency illumination appears to violate NEC 700.12 (E). 6. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006. 7. Could not read all luminaire designations. REVIEW INCOMPLETE AND WILL RESUME AFTER LEGIBILITY AND FONT SIZE ISSUES RESOLVED. |
07/01/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Thermostats shall be located no higher than 48" above the finished floor. Reference: Section 308.2.2, ICC/ANSI A117.1-2003. |
07/01/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. MIN SIZE LETTERING 1/8" 2. CAN NOT ACCESS TOILET THROUGH STORAGE ROOM 3. PROVIDE CORRIDOR CODE ANALYSIS FOR FIRE RATING REQUIREMENT AND NOTE ON DRAWINGS 4. PROVIDE ALL NEW PARTITION TYPES REFERENCES |
07/01/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
07/01/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks require cleanouts regardless of length). Reference: Section 707.4, UPC 2006. 2. Show how the temperature of the hot water supply to the public lavatory is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. |
07/02/2008 | MARTIN BROWN | FIRE | REVIEW | Approved | |
07/23/2008 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |