Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL BLDG/ZONING/ENGINE/WWM
Permit Number - T08CM02302
Review Name: RESIDENTIAL BLDG/ZONING/ENGINE/WWM
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/13/2008 | TERRY STEVENS | ZONING | REVIEW | Denied | A lot split was applied for but never completed. S08-062. Provided documentation that the lot split was finaled. Because of the lot split, NPPO review and approval is required. If a design development option (DDO) has been applied for, the site plan cannot be approved until the DDO has been completed and approved. |
08/13/2008 | ANDREW CONNOR | NPPO | REVIEW | Passed | |
08/18/2008 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. DUPLEX - UNIT #1 AND #2 2. NEEDS WASTEWATER 8TH FLOOR REVIEW OF EXISTING SEWER CONNECTION WITH EASEMENTS & USE AGREEMENTS FOR DUPLEX @ 421 & 423 N HOFF AV - 740-6544 ILENE DECKARD |
08/22/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Denied | DATE: August 22, 2008 SUBJECT: Duplex TO: Chip Brady LOCATION: 424 N Hoff, T14S, R13E, Section 12, Ward 6 REVIEWERS: Bianca Ramirez, CFM ACTIVITY: T08CM02302 (First Review) 1. Unable to approve duplex building permit until lot spilt procdure has been completed. 2. Submit DDO information to be submitted with next submittal. 3. Additional comments may be forthcoming. If you have any questions please feel free to contact me at bianca.ramirez@tucson.az.gov or 837-4928. Bianca Ramirez, CFM Engineering Associate 201 N Stone Ave PO BOX 27210 Tucson, AZ 85726-7210 |
08/27/2008 | CPIERCE1 | BUILDING-RESIDENTIAL | REVIEW | Needs Review |