Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T08CM02293
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/28/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 07/29/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; Central District; 18,067 Square Foot Warehouse; $29,137.87 |
| 07/29/2008 | MARTIN BROWN | FIRE | REVIEW | Denied | Verify S-2 classification (no storage above 12' AFF, no storage of combusitble materials, etc. Please provide design criteria for sprinkler system, including 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. |
| 07/31/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 08/22/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
| 08/22/2008 | STEVE SHIELDS | ZONING | REVIEW | Approved | 07/29/2008 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming. |