Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T08CM02269
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/16/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A2.1: SINCE THE JANITOR'S CLOSET 244 WAS REMOVED, WAS THE SERVICE SINK RELOCATED? DID NOT LOCATE ON REVISED PLANS. VERIFY. |
11/24/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Submit an appeal to the building official justifying the use of the 2004 Oregon Mechanical Specialty Code in lieu of the 2006 International Code (with local amendments) for the ventilation calculations. |
12/01/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Item 2 of the Plumbing General Notes (sheet P-1.0) has been modified to show the International Plumbing Code as the governing code; revise the note to show that the Uniform Plumbing Code governs. (See also the note on sheet P-2.2, Plumbing Roof Plan.) 2. The "instant electric water heater" (IWH-1) called out for sink S-2 is actually a storage-type water heater. Provide a detail showing how it is to be installed, including valves and a thermal expansion tank. Reference: Section 608.3, UPC 2006. 3. Show the size, route and termination of the T&P relief piping for IWH-1. Reference: Section 608.5, UPC 2006. 4. The vent connection point (detail 1/P-2.2) shall be at least two diameters of the trap arm from the trap weir. Reference: Section 1002.2, UPC 2006. 5. Coordinate the hot and cold water pipe sizes and arrangements as shown on sheets P-1.1, P-2.1, and P-3.0. Reference: Section 103.2.3, UPC 2006. 6. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (lower floor). Reference: Section 707.4, UPC 2006. 7. Clarify the route of the existing 4" SS branch that appears to run through the elevator pit. Reference: Section 103.2.3, UPC 2006 and Section 3004.4, IBC 2006. |
12/02/2009 | RICK HOLLANDER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Plans denied for following: 1. Provide information on plans for grounding of 225 KVA transformer. Include size of grounding electrode conductor and bonding jumpers. 2005 NEC 250.30 2. Provide complete fault current analysis on plans per city submittal requirements. 3. Provide complete single line diagram of service for building and tenant. Provide building service size and load on service. City submittal requirements. 4. On sheet E5.1 have panel "DP" and on sheet E5.2 have panel "DB" are these the same panel? Need to clarify. 5. Is there existing outdoor emergency powered egress lighting as part of the shell building or does it need to be included in this project? Need to clarify. 6. Ground symbol at panel 4DB on sheet E5.1 does not include any information with it. What is it for? Need to clarify. 7. IECC calculations appear to be incorrect. For example H1 fixture on plans shown to be 75 watt and on IECC calculations shown to be 30 watt. M8 fixture on IECC calculations shown to have 301 watts when fixture schedule has M8 containing 8-42 watt lamps. This calculates to 336 watts just using lamp wattage and not actual ballast rating. Need to check all IECC calculations. Rich Jiroudek Electric plans examining 520-954-0161 |
12/08/2009 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/23/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |
12/23/2009 | SUE REEVES | REJECT SHELF | Completed |