Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/13/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A2.1; PLAN 1: AN ACCESSIBLE STATION FOLLOWING ICC/ANSI A117.1-2003 IS REQUIRED; OR, PROVIDE A PORTABLE, ACCESSIBLE STATION; OR, REVISE THE TEACHER STATION (2/A2.1) TO MAKE IT ACCESSIBLE PER ANSI REQUIREMENTS. 2. SHEET A2.1; ELEVATION 10: A PORTION OF THE COMPUTER COUNTER NEEDS TO BE ACCESSIBLE PER ANSI REQUIREMENTS. 3. SHEET A2.1; CLASSROOM PLAN: EYE WASH NEEDS TO BE ACCESSIBLE PER ANSI REQUIREMENTS. |
06/13/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
06/16/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/26/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. The Code Analysis Data sheet submitted by the architect indicates that the 2006 IPC has been used as the basis for design. This review is based on the 2006 UPC; provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC. 2. Clarify detail 202/P2.0 with regard to the fittings depicted for the cleanout. Reference: Section 103.2.3, UPC 2006. 3. Resize the drainage piping to conform to Table 7-5, UPC 2003, with no more than 4 2-unit traps on a 2" horizontal waste line. Reference: Section 703.2, UPC 2006. 4. Provide cleanouts sized per Section 707.11, UPC 2006. 5. Clarify detail 201/P2.0 with regard to the location of the AAV; is it in the wall with the riser or in the cabinet? In either case, if it is to be used as a cleanout, it must comply with all of the requirements of Section 707, UPC 2006 for construction, listing, and access, as well as being gas-tight. 6. Provide sufficient information to evaluate the size of the new gas pipe and the effect of the new load on the existing gas piping. Reference Sections 103.2.3 and 1217.0, UPC 2006. 7. Revise the emergency gas shut off valve to be readily accessible. Reference: Section 1212.3 (D), UPC 2006. 8. Show how detail 207/P2.0 meets the intent of Section 1211.1.6, UPC 2006 to allow a gas leak to be identified if the vent is to be located above the roof. |
06/26/2008 | ROBERT SHERRY | WATER | REVIEW | Denied | Clarify the size of the existing water meter. Is it 2" as stated in the calculations and in the key plan on sheet P1.0 or is it 1-1/2" as stated in the note on sheet P1.0? |
06/26/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show that the new science classroom has adequate ventilation per Section 403.3, IMC 2006. |
06/27/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
07/10/2008 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/02/2008 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |