Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T08CM01781
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/07/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 2. Provide an upper terminal cleanout for sink P-4. Reference: Section 707.4, UPC 2006. 5. Sink P-4, as shown in detail 8/P2.01, appears to have two traps in violation of Section 1001.1. 6. Revise detail 8/P2.01 to show the vent for interceptor P-5 as shown on riser diagram 1/P3.01. Reference: Section 1009.4, UPC 2006. 7. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 8. Show that the vacuum relief for the water heater is located per the manufacturer's listing requirements. Reference: Sections 310.4 and 608.7, UPC 2006 |
07/07/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 2. Comment not addressed. Show how the submitted calculations provide adequate ventilation comparable to that required by Section 403.3, IMC 2006 as amended by the City of Tucson. 3. Comment not addressed. Clarify the key notes for the exhaust fans. Show how the restroom exhaust complies with Section 403.2.1 (3), IMC 2006. 4. Provide calculations and structural details to show how the new rooftop unit is to be supported from the existing roof. 5. Clarify the data shown on the rooftop unit schedule and show that the data complies with the manufacturer's listing requirements for both the existing units and the new unit. Coordinate the data with the airflows shown on the mechanical plan. 6. Show that the deep seal trap noted in detail complies with the manufacturer's listing requirement for sizing. Coordinate the notes in detail 4/M2.01 (e.g. #8) with the information shown on the detail and with the plumbing plan, P1.01. 7. The building official for the City of Casa Grande is probably is not interested in a balance report for this tenant improvement. Give a copy of the final report to the mechanical inspector. |
07/08/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. THE ONE TOILET DOES COMPLY WITH ACCESSIBILITY. HOWEVER, MERCHANTILE OCCUPANCY ABOVE 50 PEOPLE REQUIRES TWO TOILETS. PLEASEPROVIDE TWO TOILETS PROVIDE ALL REQUIRED TOILET ELEVATIONS. 2. BRACE TOP OF NEW INTERIOR WALLS TO RESIST LOADS PER 2006 IBC 1607.13. REVISE DETAIL 16/A-3 ACCORDINGLY. 3. 1/8" LETTERING REQUIRED ON ALL DRAWINGS. WRITTEN APPEAL MAY BE MADE TO THE BUILDING OFFICIAL, JESSIE SANDERS. 4. PROVIDE STRUCTURAL MOUNTING DETAILS AND CALCULATIONS FOR ALL NEWLY ROOF MOUNTED EQUIPMENT. 5. PROVIDE STRUCTURAL MOUNTING DETAILS AND CALCULATIONS FOR ALL EXHAUST FANS SUPPORTED FROM THE BOTTOM OF THE EXITING STEEL JOISTS. 6. PROVIDE STRUCTURAL MOUNTING DETAILS AND CALCULATIONS FOR WALL MOUNTED WATER HEATER. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/21/2008 | DELMA ROBEY | APPROVAL SHELF | Completed |
07/21/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
07/21/2008 | GERARDO BONILLA | REJECT SHELF | Completed |