Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM01537
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/15/2008 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
05/15/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
05/15/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
05/15/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
05/16/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T08CM01537 5/16/08 1. K-1 220V on Kitchen Equipment Schedule, and 208V on Panel Schedule. Please clarify. 2. K-4 208V on Kitchen Equipment Schedule, and 120V on Panel Schedule. Please clarify. 3. K-5 120V on Kitchen Equipment Schedule, and 208V on Panel Schedule. Please clarify. 4. K-5 6050W/120V = 50A, not 25. Clarify. 5. Track lights 48LF, not 40. With continuous load 4.5Va, not 3.8. 6. Consider Water Heater as a continuous load. Reference NEC 422.13. 7. AC MOCP 35A per Mechanical Equipment Schedule. Specify fuse size or change CB size. 8. Show existing location of panel on plans. If intent is to relocate it into the wall from the same exterior location, this can simply be noted on the Power Plan as such. |
05/16/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide additional information regarding the materials and installation of the flue for the coffee roaster. |
05/16/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/16/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/16/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide upper terminal cleanout for the building drain. 2. If the appliances directly connected to the water supply are not equiped with either an air gap or an integral backflow device, specify a backflow device for each appliance. 3. Correct the size of the gas pipe supplying the roaster. 4. Show how the water heater platform is connected to the wall. |
05/21/2008 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |