Permit Review Detail
Review Status: Active
Review Details: POST 3RD PARTY REVIEW
Permit Number - T08CM01526
Review Name: POST 3RD PARTY REVIEW
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/05/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; East District; 16,850 Square Feet Office/Warehouse; 5,865 Square Feet of Demolition applied from T08BU01007. Remaining Impact Fee's minus the demolition credits are $23,019.64 *Effective January 16, 2009...All commerical permits issued 1.16.09 and after will include police, fire, and public facilities. Impact Fee's Today Through 1.15.09 = $23,019.64 Impact Fee's 1.16.09 and after = $36,498.25 |
| 12/08/2008 | TERRY STEVENS | ZONING | REVIEW | Approved | |
| 12/09/2008 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 12/10/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 12/17/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | December 16, 2008 T08CM01526 Uable to approved building plan at this time. All Floodplain Use Permit T08OT02017 requirements will need to be met prior to approval. Bianca Ramirez, CFM Engineering Associate 12/17/08 - Drainage Report dropped off for further review. -------------------------------------------------------------------------------------- December 17, 2008 FLOODPLAIN USE PERMIT # T08OT02017 PROJECT ADDRESS: 4780 E 22nd Street APPLICANT'S NAME: CDG Architects PROPERTY OWNER: O'Rielly Chevrolet This parcel lies in a City of Tucson identified 100-year floodplain (Sheet Flooding). The applicant is authorized to use a portion of the flood hazard area in the City of Tucson, Arizona, on the property described as: 4780 E 22nd Street, Tucson, AZ 85711, E300' W709.17' S400' N475' NW4 2.48 AC SEC 23-14-14. In a portion of Township 14 South, Range 14 East, Section 23, for the construction of a New Metal Sales/Service Building. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard, and Watercourse Amenities, Safety and Habitat regulations, and are particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, County, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit. The following conditions apply to this permit: 1) This permit becomes invalid and is subject to additional floodplain review, if any required development permit changes the configuration of the improvement, or, if there is any further disturbance within the floodplain other than that outlined in this application. This floodplain use permit may be subject to conditions or restrictions designed to reduce or mitigate the potential damage or hazard to life or property resulting from development within the regulatory floodplain, floodway or erosion hazard areas as determined by the project engineer and accepted by the City of Tucson. 2) Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 3) The proposed New Metal Sales / Service Building is located within a City of Tucson identified 100-year floodplain (Sheet Flooding), as defined in The Floodplain and Erosion Hazard Management Ordinance, Chapter 26 of the Tucson Code (Ordinance). 4) Per submitted and approved Drainage Report For O'Rielly Truck Center, by J.E. Fuller Hydrology and Geomorphology, Inc., signed and sealed by Cyrus Daniel Miller (Dated 4/10/2008) for purposes of this permit the following flood elevations shall be used per Drainage Report: Base Flood Elevation (BFE) = 2558.4 feet NAVD 1988 Regulatory Flood Elevation (RFE) = 2559.4 feet NAVD 1988 Finished floor of the New Metal Sales / Service Building and the lowest point of any attached appliances including water heater, air conditioning units, etc. are to be at or above the Regulatory Flood Elevation (RFE). 5) Floodplain Approval of elevation certificate, prepared by an Arizona State Registered Land Surveyor, is required prior to final approval of New Metal Sales / Service Building or electrical inspection. The Elevation Certificate must include the identity and elevation of the lowest service equipment/machinery servicing the building as well as the identity and location of all other equipment/machinery servicing the building. All elevation certificates are to be returned to Development Services - Engineering Department at 201 N Stone on the 1st floor - for review, approval and the release for inspections. 6) Certification is required by an Arizona State Registered Professional Civil Engineer that the finished floor of the building meets all the requirements of Chapter 26 of the Ordinance. 7) All work shall conform to the approved details, Site Plan and Drainage Report for O'Riley Truck Center which are made part of this permit. 8) Within 5 (five) days of issuance of this permit, and through completion of the project, notification must be posted and maintained in a conspicuous place on the job site stating "CONSTRUCTION PROCEEDING UNDER REQUIREMENTS OF CITY OF TUCSON FLOODPLAIN USE PERMIT # T08OT02017 FOR INFORMATION PLEASE CALL 791-5550." 9) This Floodplain Use Permit and plans shall be kept in a readily accessible location on site at all times. 10) Any additional future disturbance of the floodplain shall have separate floodplain use permit applications submitted to this office for review and approval. 11) Contractor will need to call for floodplain use permit inspections by Development Services Department Engineering Division Inspection Team (791-5550) prior to and after the construction of the New Metal Sales / Service Building. 12) See the associated activity T08CM01526. This Floodplain Use Permit will be automatically revoked and becomes invalid for non-compliance to conditions set forth in this permit. Also, this permit will expire one year from its date of approval. Renewal of this permit will require a new application, review and approval of that application by the City of Tucson, Development Services Department, Engineering Division. (EXPIRATION DATE) Month: 12 Day: 17 Year: 2009 APPLICANT/CONTRACTOR: CDG Architects ADDRESS: 4780 E 22nd Street, Tucson, Arizona 85711 PHONE: (520) 629-9752 OWNER: O'Rielly Chevrolet ADDRESS: 4780 E 22nd Street, Tucson, Arizona 85711 PHONE: (520) 747-8302 SIGNATURE OF APPLICANT DATE The applicant is authorized by the City Engineer to receive a floodplain use permit subject to the above referenced conditions and restrictions. |
| 12/19/2008 | ROBERT SHERRY | WATER | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/31/2008 | SUE REEVES | APPROVAL SHELF | RECEIVED |